Jump to content

  • Quick Navigation
Photo

Contamination control

Share this

  • You cannot start a new topic
  • Please log in to reply
2 replies to this topic
- - - - -

Gaskit

    Grade - MIFSQN

  • IFSQN Member
  • 106 posts
  • 12 thanks
3
Neutral

  • Jamaica
    Jamaica
  • Gender:Male
  • Location:Greater Manchester

Posted 25 July 2005 - 03:15 PM

Dear All,

Just completing a final check of the new standard prior to my BRC inspection on 23rd and have seemed to have missed section 6.1.2 addition:

A written policy and documented controls shall be in place for:

ALL MATERIALS USED IN THE CONSTRUCTION, FIXTURE AND FITTINGS OF THE PRODUCTION AREA WHICH COULD BE CONFUSED WITH PACKAGING MATERIALS.

I am intending to write the above into the maintenance hygiene procedure and the handover from maintenance document and perhaps re-naming to maintenance / contactors hygiene procedure.

Anyone have any further ideas :uhm:

Regards,

Steve


I know God will not give me anything I cann't handle, I just wish that he didn't trust me so much.

Simon

    IFSQN...it's My Life

  • IFSQN Admin
  • 12,831 posts
  • 1363 thanks
881
Excellent

  • United Kingdom
    United Kingdom
  • Gender:Male
  • Location:Manchester
  • Interests:Married to Michelle, Father of three boys (Oliver, Jacob and Louis). I enjoy cycling, walking and travelling, watching sport, especially football and Manchester United. Oh and I love food and beer and wine.

Posted 25 July 2005 - 08:43 PM

I think you're right Steve the 3rd requirement of 6.1.2 should be covered by safe building and equipment design and also preventive maintenance activities for equipment and machines, Central to this is the 'safe-sign off' following maintenance / tool changes etc. Of course this should also apply to contractors.

A note to add also consider product off-cuts.

Hope this helps.

Regards,
Simon


Get FREE bitesize education with IFSQN webinar recordings.
 
Download this handy excel for desktop access to over 180 Food Safety Friday's webinar recordings.
https://www.ifsqn.com/fsf/Free%20Food%20Safety%20Videos.xlsx

 
Check out IFSQN’s extensive library of FREE food safety videos
https://www.ifsqn.com/food_safety_videos.html


Gaskit

    Grade - MIFSQN

  • IFSQN Member
  • 106 posts
  • 12 thanks
3
Neutral

  • Jamaica
    Jamaica
  • Gender:Male
  • Location:Greater Manchester

Posted 26 July 2005 - 08:09 AM

I think you're right Steve the 3rd requirement of 6.1.2 should be covered by safe building and equipment design and also preventive maintenance activities for equipment and machines, Central to this is the 'safe-sign off' following maintenance / tool changes etc.  Of course this should also apply to contractors.

A note to add also consider product off-cuts.

Hope this helps.

Regards,
Simon

<{POST_SNAPBACK}>


Dear Simon,

Much appreciated, I had not considered product offcuts which are a big production side line in our business. :doh:

Thanks and Regards,

Steve

I know God will not give me anything I cann't handle, I just wish that he didn't trust me so much.



Share this

0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users