aps

    Grade - MIFSQN

  • IFSQN Member
  • 166 posts
  • 4 thanks
0
Neutral

  • United Kingdom
    United Kingdom
  • Gender:Male
  • Location:United Kingdom

Posted 25 March 2011 - 01:20 PM

Please can someone refresh me in teking me how often I should review my company policies. Although nothing has changed they are currently dated 2010 is this ok or do i need to put 2011

The reasons I ask is I have a BRC audit in 3 weeks and i need to box off

Thanks



SriramB

    Grade - MIFSQN

  • IFSQN Member
  • 56 posts
  • 12 thanks
4
Neutral

  • New Zealand
    New Zealand
  • Gender:Male
  • Location:AKL
  • Interests:SF, Graphic novels, SUFI Music

Posted 26 March 2011 - 03:27 AM

Please can someone refresh me in teking me how often I should review my company policies. Although nothing has changed they are currently dated 2010 is this ok or do i need to put 2011

The reasons I ask is I have a BRC audit in 3 weeks and i need to box off

Thanks



Hi aps,

Seems to me you just completed your review and recommended in "no change" or "continuation" of the policy. :smile: and could put in today's date!

(hopefully, you have mentally accounted for last years performance, listened to the opinion of the powers that be, any regulatory changes you have been affected by, considered your customers requirements, looked at your product charcteristics, scope etc... when you say nothing has changed)


mind over matter

    Grade - SIFSQN

  • IFSQN Senior
  • 369 posts
  • 44 thanks
3
Neutral

  • Philippines
    Philippines

Posted 26 March 2011 - 04:30 AM

Please can someone refresh me in teking me how often I should review my company policies. Although nothing has changed they are currently dated 2010 is this ok or do i need to put 2011 The reasons I ask is I have a BRC audit in 3 weeks and i need to box off Thanks


I cannot speak for BRC but from ISO 9001 viewpoint.

5.3 Quality Policy
e) is reviewed for continual suitability

The common practice isthat the QP review usually being done during management review. So, it depends upon your frequency of management review. When you review it and find it is still ok, suitable for your company that could be fine. Just show in your Management Review minutes that it was reviewed and reaffirmed.

Hope this helps.

Edited by mind over matter, 26 March 2011 - 04:37 AM.


Dr Ajay Shah

    Grade - SIFSQN

  • IFSQN Senior
  • 318 posts
  • 106 thanks
6
Neutral

  • Australia
    Australia
  • Gender:Male
  • Location:Melbourne

Posted 06 April 2011 - 04:48 AM

It is good practice to review the Quality Policy once per annum and make reference to it when you condust you management review meetings and that should suffice.

Regards

Ajay


Dr Ajay Shah.,
BSc (Hons), MSc, PhD, PGCE(FE)
Managing Director & Principal Consultant
AAS Food Technology Pty Ltd
www.aasfood.com


poppysnoss

    Grade - MIFSQN

  • IFSQN Member
  • 146 posts
  • 10 thanks
1
Neutral

  • United Kingdom
    United Kingdom

Posted 06 April 2011 - 09:26 AM

I review our entire Quality Manual annually.

Where changes are made, they are implemeted with a review date of 12 months time. Where changes are not made, it is documented that procedure reviewed and 'No changes required' and a date is set to review in a further 12 months.

This shows that you are continually checking the validity of the manual, rather than sitting it up on a shelf until your next audit.

Hope this helps.

Pops



Dr Ajay Shah

    Grade - SIFSQN

  • IFSQN Senior
  • 318 posts
  • 106 thanks
6
Neutral

  • Australia
    Australia
  • Gender:Male
  • Location:Melbourne

Posted 14 April 2011 - 02:49 AM

I totally am in agreement with Poppysnoos as one should review the whole manual at least annually but do try and oversse it twice per annume as you may want to improve and change things in various sections.


Dr Ajay Shah.,
BSc (Hons), MSc, PhD, PGCE(FE)
Managing Director & Principal Consultant
AAS Food Technology Pty Ltd
www.aasfood.com


mind over matter

    Grade - SIFSQN

  • IFSQN Senior
  • 369 posts
  • 44 thanks
3
Neutral

  • Philippines
    Philippines

Posted 14 April 2011 - 05:17 AM

aps,

Ah, I just realized that you were talking about the whole QMS documents, not just Quality Policy. ISO does not say how often a review needs to be done. The standard says "...review and update as necessary..." So if there are no changes made, you could note in your “Document Review Form” that you reviewed all your documentation and no update is necessary.


Edited by mind over matter, 14 April 2011 - 05:18 AM.


GMO

    Grade - FIFSQN

  • IFSQN Fellow
  • 2,849 posts
  • 726 thanks
236
Excellent

  • United Kingdom
    United Kingdom

Posted 20 April 2011 - 08:15 PM

Personally I try to review all documents at least annually. QPulse is a great tool for doing this and prove you do it. It's probably ok not to, I am a bit anally retentive at times but it is a good idea to read through every document at least once a year and say to yourself "is this still relevant?" "Does this still meet the standards?" "Does this match other documents in our FSQMS?" etc. You'd be surprised how many times I've audited a site and found documents contradict each other! It's very easy to get through a year and not have reviewed some documents.

That all said if you have thoroughly reviewed a document during an audit and, say, made a change as a result, I would ignore that document until the next year unless it crops up again. Don't create work!



wilkindubai

    Grade - Active

  • IFSQN Active
  • 8 posts
  • 6 thanks
0
Neutral

  • United Arab Emirates
    United Arab Emirates
  • Gender:Male
  • Location:Dubai

Posted 28 May 2011 - 06:23 AM

An interesting question - to which there is no correct answer.

Reviewing annually is essential.

But reviewing more frequently is good practice; it depends upon what's happening inside your processes. You say that nothing has changed - I can't believe that! No new employess, new suppliers, new equipment, new recipes/products, etc?

The best time to conduct a thorough review is not a few days before the assessment. The assessor is seeking evidence that your management system is under control - doing reviews, and taking corrective actions, immediately prior to an assessment shows that your system is not under control.