Failure was:
Shaft broke in an AC unit above product. Corrective actions were taken and documented. Root cause analysis was performed and it was determined that the shaft broke in the AC unit. This has only happened once before in 10 years, so I don't feel we can say it needs to be on a PM schedule. Any thoughts on what a true PM would be for something like this?
Thanks!