5.5 In-line testing and measuring equipment

Share this

  • You cannot start a new topic
  • Please log in to reply
4 replies to this topic
- - - - -

ap87

    Grade - Active

  • IFSQN Active
  • 10 posts
  • 0 thanks
0
Neutral

  • Denmark
    Denmark

Posted 27 October 2014 - 09:00 AM

Hello,

 

We are attempting to address 5.5 In-line testing and measuring equipment efficiently.

Does anyone have any recommendations as to how one can effectively and constructively approach this clause? 

I have called my production manager in for a meeting where I intend to develop a procedure for how a system taking care of the specifics in this clause should be developed. 

But I know that both he and I are somewhat wary about how to address this one correctly. 

Any advise or examples of how you address this clause at your company would be greatly appreciated.

 

Sincerely,

 

Anne from Denmark



Snookie

    Grade - FIFSQN

  • IFSQN Fellow
  • 1,625 posts
  • 267 thanks
174
Excellent

  • United States
    United States
  • Gender:Female

Posted 27 October 2014 - 03:53 PM

In order to best help you, we are going to need more information, such as what you are making and how you are doing it. 


Posted Image
Live Long & Prosper

fgjuadi

    Grade - PIFSQN

  • Banned
  • 898 posts
  • 203 thanks
28
Excellent

  • United States
    United States
  • Gender:Male

Posted 27 October 2014 - 04:25 PM

List all of our measuring & testing devices (ex - thermometer or thermocouple, metal detector, scales, anything that measures etc )

List the  acceptable deviation (if you're reading at 50 deg and it's really 52 deg, does that matter to your process? What if it's 43 degrees? etc)

Calibrate them annually - or at frequency determined by risk assessment

Put them on a equipment list with a calibration schedule

Keep certificates


.--. .- -. - ... / --- .--. - .. --- -. .- .-..

ap87

    Grade - Active

  • IFSQN Active
  • 10 posts
  • 0 thanks
0
Neutral

  • Denmark
    Denmark

Posted 29 October 2014 - 08:26 AM

Thanks!

 

We produce self-adhesive labels.

We have in-line equipment in our production machines - nothing with temperatures though.



Hazira

    Grade - Active

  • IFSQN Associate
  • 18 posts
  • 2 thanks
0
Neutral

  • Malaysia
    Malaysia

Posted 21 November 2014 - 04:23 AM

Hi Anne,

 

I am from injection moulding company producing cutlery. In my case, the applicable in-line equipment in the process is the alarm system at the injection moulding machine. So we had testing for the alarm system, either working when the temperature exceed or lower that the set supervisory range temp. 