Jump to content

  • Quick Navigation
Photo

Anyone have example for batch coding in dairy


  • You cannot start a new topic
  • Please log in to reply
7 replies to this topic

#1 Mohammed Ashmawy

Mohammed Ashmawy

    Grade - Active

  • IFSQN Associate
  • 22 posts
  • 1 thanks
1
Neutral

  • Egypt
    Egypt
  • Gender:Male
  • Location:Egypt

Posted 18 February 2015 - 11:15 AM

kindly anyone have example for batch coding fit in dairy share with me


  • 0

#2 Teecem

Teecem

    Grade - Active

  • IFSQN Active
  • 15 posts
  • 7 thanks
1
Neutral

  • United Kingdom
    United Kingdom

Posted 18 February 2015 - 12:32 PM

Hi,

 

I think we will need more details of what you are needing. Is it for work in progress? Finished product? Raw material? What is the end product?


  • 0

#3 Mr. Incognito

Mr. Incognito

    "Mostly Harmless"

  • IFSQN Fellow
  • 1,552 posts
  • 258 thanks
121
Excellent

  • Earth
    Earth
  • Gender:Male

Posted 18 February 2015 - 12:37 PM

Multiple production lines? 


  • 0
____________________________________________________________________________________________________

Mr. Incognito


:tardis:

Mr. Incognito is a cool frood who can travel the width and breadth of the galaxy and still know where his towel is.

#4 cazyncymru

cazyncymru

    Grade - FIFSQN

  • Banned
  • 1,604 posts
  • 320 thanks
121
Excellent

  • Earth
    Earth
  • Gender:Male

Posted 18 February 2015 - 02:56 PM

Shelf Life?


  • 0

#5 Mohammed Ashmawy

Mohammed Ashmawy

    Grade - Active

  • IFSQN Associate
  • 22 posts
  • 1 thanks
1
Neutral

  • Egypt
    Egypt
  • Gender:Male
  • Location:Egypt

Posted 18 February 2015 - 08:22 PM

in prepration of UHT milk, to records QTY, Prod. Date, Exp. date and lot No. of milk powder, sugar, butter oil, flavor, stabilzr, then packaging material.

 

plan to use it as plan b for traceability 


  • 0

#6 Tony-C

Tony-C

    Grade - FIFSQN

  • IFSQN Fellow
  • 2,955 posts
  • 790 thanks
167
Excellent

  • United Kingdom
    United Kingdom
  • Gender:Male
  • Location:Koh Samui
  • Interests:My main interests are sports particularly football, pool, scuba diving, skiing and ten pin bowling.

Posted 22 February 2015 - 06:53 AM

Hi Mohammed,

 

Your traceability system should include records to trace from intake of materials through to delivery of final product to customer:

 

Attached File  QM 3.9 Identification and Traceability S.jpg   397.85KB   1 downloads

 

Regards,

 

Tony


  • 0

Thanked by 1 Member:

#7 Tony-C

Tony-C

    Grade - FIFSQN

  • IFSQN Fellow
  • 2,955 posts
  • 790 thanks
167
Excellent

  • United Kingdom
    United Kingdom
  • Gender:Male
  • Location:Koh Samui
  • Interests:My main interests are sports particularly football, pool, scuba diving, skiing and ten pin bowling.

Posted 22 February 2015 - 06:59 AM

Apologies for the double post but the second image wouldn't upload into the same post.

 

Here is an example of a way to allocate batch codes when you are making multiple batches:

 

Attached File  Product Identification and Traceability System - Appendix S.jpg   101.41KB   0 downloads

 

Regards,

 

Tony

 


  • 0

#8 Mohammed Ashmawy

Mohammed Ashmawy

    Grade - Active

  • IFSQN Associate
  • 22 posts
  • 1 thanks
1
Neutral

  • Egypt
    Egypt
  • Gender:Male
  • Location:Egypt

Posted 22 February 2015 - 12:22 PM

thanks tony 


  • 0




0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users