HI,

 

We are due our PIU and I've been told specs get locked on TTL before they arrive. Anyone confirm this ?

 

Cheers



Belmont2201

    Grade - Active

  • IFSQN Associate
  • 17 posts
  • 2 thanks
0
Neutral

  • United States
    United States

Posted 04 October 2016 - 11:50 PM

I am not familiar with their protocols/procedures.

My apologies for not being able to help assist in this manner.



Charles.C

    Grade - FIFSQN

  • IFSQN Moderator
  • 20,542 posts
  • 5662 thanks
1,544
Excellent

  • Earth
    Earth
  • Gender:Male
  • Interests:SF
    TV
    Movies

Posted 05 October 2016 - 01:05 AM

I am not familiar with their protocols/procedures.

My apologies for not being able to help assist in this manner.

 

Hi Belmont,

 

No problem. Thanks for yr other inputs.

 

Personally i have no idea what PIU or TTL stand for.


Kind Regards,

 

Charles.C


ChrisM

    Grade - Active

  • IFSQN Active
  • 14 posts
  • 3 thanks
1
Neutral

  • Ireland
    Ireland

Posted 05 October 2016 - 08:18 AM

Andy Hi,

 

The specs. should be locked, if they are not, they have not been authorised by the Tesco Technical Manager and you will be given a NC by the PIU auditor. However, if you have asked the TTM to authorised i.e. approve the spec they will get a NC.

 

Charles

PIU Product Integrity Unit

TTL Tesco Technical Library

 

Kind regards

 

Chris

.



Charles.C

    Grade - FIFSQN

  • IFSQN Moderator
  • 20,542 posts
  • 5662 thanks
1,544
Excellent

  • Earth
    Earth
  • Gender:Male
  • Interests:SF
    TV
    Movies

Posted 05 October 2016 - 09:19 AM

Andy Hi,

 

The specs. should be locked, if they are not, they have not been authorised by the Tesco Technical Manager and you will be given a NC by the PIU auditor. However, if you have asked the TTM to authorised i.e. approve the spec they will get a NC.

 

Charles

PIU Product Integrity Unit

TTL Tesco Technical Library

 

Kind regards

 

Chris

.

 

Hi Chris,

 

Thank you, i should have remembered -

 

http://www.ifsqn.com...ge-2#entry31222

 

Sounds like George Orwell's 1984 = Tescospeak. I deduce "locked" means posted.


Kind Regards,

 

Charles.C