Jump to content

  • Quick Navigation
Photo

Clause 7.8/8.4.3 – Responsibility for Verification Activities

Share this

  • You cannot start a new topic
  • Please log in to reply
2 replies to this topic
- - - - -

Anf

    Grade - Active

  • IFSQN Active
  • 15 posts
  • 0 thanks
3
Neutral

  • Norway
    Norway

Posted 17 October 2017 - 11:56 AM

Hi all,

 

 

According to clause 7.8 "Verification results shall be recorded and shall be communicated to the food safety team", and according to clause 8.4.3 "The food safety team shall analyse the results of verification activities, including the results of the internal audits (see 8.4.1) and external audits."

 

 

Does your HACCP-team analyse the results of absolutely all verification activities and if not, which are delegated to others?

 



Tony-C

    Grade - FIFSQN

  • IFSQN Fellow
  • 4,224 posts
  • 1292 thanks
610
Excellent

  • United Kingdom
    United Kingdom
  • Gender:Male
  • Location:World
  • Interests:My main interests are sports particularly football, pool, scuba diving, skiing and ten pin bowling.

Posted 18 October 2017 - 06:00 AM

Hi Anf,

 

I would expect that the Management Team would participate in this activity. It is normal to have regular Management meetings to discuss performance which should include Key Performance Indicators (KPIs) related to the results of verification activities such as the results of audits and product non-conformances.

 

There is some guidance in ISO 22004: Food safety management systems — Guidance on the application of ISO 22000:2005, here are a couple of extracts:

 

A schedule of verification activities is developed as part of the food safety management system (planned according to 7.8 and evaluated according to 8.4.2 of ISO 22000:2005). This schedule should include the procedures or methods to be utilized, the frequency and the person(s) responsible for performing the activity. Examples of verification activities that should be considered as part of the system include
— reviewing monitoring records,
— reviewing deviations and their resolution or corrective action, including the handling of affected product,
— calibrating thermometers or other critical measuring equipment,
— visually inspecting operations to observe if control measures are under control,
— analytically testing or auditing monitoring procedures,
— randomly collecting and analysing samples of in-process or end product,
— sampling for environmental and other concerns, and
— reviewing consumer or customer complaints to determine whether they relate to the performance of the control measures or reveal the existence of unidentified and/or need for additional control measures.
 
The periodic verification activities involve the overall assessment of the system (see 8.4.3 of ISO 22000:2005). This is usually performed during a management or verification team meeting, and all the above evidence over a period of time is reviewed to ascertain if the system is functioning as planned and if updating or improvement is necessary. Notes of the meeting should be kept and should include any decisions made regarding the system. At a minimum, verification of the entire system in this manner should take place on an annual basis.

 

Kind regards,

 

Tony

 



Thanked by 2 Members:

Anf

    Grade - Active

  • IFSQN Active
  • 15 posts
  • 0 thanks
3
Neutral

  • Norway
    Norway

Posted 18 October 2017 - 07:25 PM

Thank you for your Insight, Tony-C!





Share this

0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users