Hi Folks,
on the clause 8.2 Validation of control measure combinations, are we need to validate all control measures (PRP, OPRP & CCP)? Are is only specific control measures validation is enough (OPRP & CCP)?
I'm asking because, most of industries validation only OPRP and CCP's with plan. Am I get NC in audit if I do the same as per 8.2?