Jump to content

  • Quick Navigation
Photo

Off season quality checks (PRPs)

Share this

  • You cannot start a new topic
  • Please log in to reply
5 replies to this topic
- - - - -

Asanele

    Grade - Active

  • IFSQN Active
  • 24 posts
  • 2 thanks
1
Neutral

  • South Africa
    South Africa

Posted 23 October 2019 - 10:03 AM

Good day Quality team, can you guys advise me on this please. If your plant is operating seasonally is it necessary for the daily checks of the equipment etc for an example daily scale verifications and other equipment.

Thank you!!!


Sent from my iPhone using Tapatalk



pHruit

    Grade - FIFSQN

  • IFSQN Fellow
  • 2,072 posts
  • 849 thanks
537
Excellent

  • United Kingdom
    United Kingdom
  • Gender:Male
  • Interests:Composing/listening to classical music, electronics, mountain biking, science, sarcasm

Posted 23 October 2019 - 10:10 AM

If you're not using the equipment then no, probably not necessary to do daily checks - just make sure that you have a suitable procedure to prepare and check everything well in advance of when you need to start using it again, to (a) make sure it's still working correctly and is ready for operation, and (b) allow time for any maintenance of equipment that is found to be out of spec.



Thanked by 1 Member:

Asanele

    Grade - Active

  • IFSQN Active
  • 24 posts
  • 2 thanks
1
Neutral

  • South Africa
    South Africa

Posted 23 October 2019 - 11:07 AM

Thank you! PHruit, please advise me is this your personal opinion or from Auditors perspective?

Thank you


Sent from my iPhone using Tapatalk



mahantesh.micro

    Grade - MIFSQN

  • IFSQN Member
  • 166 posts
  • 88 thanks
28
Excellent

  • India
    India
  • Gender:Male
  • Location:Bangalore- Karnataka (India)
  • Interests:Food Safety Standards, Specification developments, Procedures
    Other interests are- cricket and indoor games

Posted 23 October 2019 - 11:25 AM

Hi Asanele,

We are not doing any verification of scales etc on national holidays, same way not required to verify when no production days, simply you can mention "no production" in the verification format. But ensure to verify and record the equipment condition before starting production after long gap.

 

Mahantesh 



Thanked by 1 Member:

Asanele

    Grade - Active

  • IFSQN Active
  • 24 posts
  • 2 thanks
1
Neutral

  • South Africa
    South Africa

Posted 23 October 2019 - 11:26 AM

Ok this make more sense.

Thank you!


Sent from my iPhone using Tapatalk



pHruit

    Grade - FIFSQN

  • IFSQN Fellow
  • 2,072 posts
  • 849 thanks
537
Excellent

  • United Kingdom
    United Kingdom
  • Gender:Male
  • Interests:Composing/listening to classical music, electronics, mountain biking, science, sarcasm

Posted 23 October 2019 - 11:31 AM

I'm not a BRC/IFS/FSSC/SQF auditor but it's relatively commonplace to mothball part/all of some types of factories that only do seasonal processing. You can check the particular standard(s) you're working with, but in a common-sense view would there be any benefit from doing scale checks if you're not going to use the scales, or alternatively, what is the risk to production of not doing checks, if there is no production happening?



Thanked by 1 Member:


Share this

0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users