Hi all, 

I have a scenario for you. Please give any feedback you have.

 

A company's SQF Practitioner quit in January. Because of this and COVID-19 the monthly internal audits and management meetings were not completed for the months of February  - August.  The company was not able to hire another SQF Practitioner until September. Once hired, the SQF Practitioner picks up the meetings and audits again for what was missed per the company schedule starting with February. These meetings and audits are being conducted on a weekly basis instead of a monthly basis in order to be ready for the SQF Recertification Audit in December. Is this acceptable or will the company be issued a nonconformance for not following the monthly schedules when there was no SQF Practitioner on site?



SQFconsultant

    SQFconsultant

  • IFSQN Fellow
  • 4,662 posts
  • 1139 thanks
1,132
Excellent

  • United States
    United States
  • Gender:Male
  • Interests:Just when I thought I was out - They pulled me back in!!!

Posted 12 October 2020 - 05:32 PM

Company will be issued a non-conformance.

 

Hopefully someone informed the CB that there was not an SQF Practitioner.

 

The question is, where is the cover person - did that person leave too?


All the Best,

 

All Rights Reserved,

Without Prejudice,

Glenn Oster.

Glenn Oster Consulting, LLC -

SQF System Development | Internal Auditor Training | eConsultant

Martha's Vineyard Island, MA - Restored Republic

http://www.GCEMVI.XYZ

http://www.GlennOster.com

 


Thanked by 1 Member:

hmeyer

    Grade - Active

  • IFSQN Active
  • 2 posts
  • 0 thanks
0
Neutral

  • United States
    United States

Posted 12 October 2020 - 08:57 PM

What type of non-conformance would they be issued? Minor, Major, or Critical?



DannyGFSC

    Grade - Active

  • IFSQN Associate
  • 8 posts
  • 2 thanks
2
Neutral

  • United States
    United States
  • Gender:Male
  • Location:California

Posted 13 October 2020 - 04:35 PM

Unfortunately, the guidelines do not allow for missed meetings and internal audits during time of turnover. The best you could do, would be to document a corrective action and explain the situation. During times of turnover, companies may be encouraged to outsource these special projects to assure year-round compliance with the SQF code.


Best,

 

Danny Carrell

 

Global Food Safety Consultants

Food Safety Consultant

Phone: (559)737-2094

Email: Danny@GlobalFoodSafetyConsultants.com

GlobalFoodSafetyConsultants.com

 


Thanked by 1 Member:

TimG

    Grade - PIFSQN

  • IFSQN Principal
  • 642 posts
  • 191 thanks
320
Excellent

  • United States
    United States

Posted 13 October 2020 - 05:40 PM

Glenn would know better, but I believe this would be a Major bordering on Critical. SQFI has strongly suggested (I think required?) that the facility have a back-up practitioner who maintains familiarity with the locations FSP for just this type of occurrence. If you follow Danny's suggestion of documenting a corrective action, having a back-up practitioner should be one of the corrections.



Thanked by 1 Member:

Ryan M.

    Grade - FIFSQN

  • IFSQN Fellow
  • 1,329 posts
  • 479 thanks
290
Excellent

  • United States
    United States
  • Gender:Male
  • Location:Birmingham, AL
  • Interests:Reading, crosswords, passionate discussions, laughing at US politics.

Posted 15 October 2020 - 12:52 PM

AFAIK...you are required to have a backup SQF practitioner, or at a minimum a backup plan in case the SQF practitioner is incapacitated.  As someone else mentioned best to have a corrective action to ensure it does not happen again.



Thanked by 1 Member:

Hoosiersmoker

    Grade - PIFSQN

  • IFSQN Principal
  • 684 posts
  • 228 thanks
122
Excellent

  • United States
    United States

Posted 15 October 2020 - 01:12 PM

Not having an adequate, qualified back up could indicate a critical system failure. Your procedures should include the Practitioner / Food Safety / QA's responsibilities and SOPs for how those functions are carried out so, even not having a trained Practitioner on site wouldn't necessarily mean non-conformance, even for a few months. You can't go back and make up missed meetings or IAs, so having the weekly meetings doesn't cover lost meetings or IAs. The accelerated IA's can't catch anything that has already happened 6 or 7 months ago. I also don't buy the "Because of this and COVID-19 the monthly internal audits and management meetings were not completed for the months of February  - August." The meetings could certainly have gone on in the absence of the Practitioner had there been any back-up at all at least virtually or by email. When we absolutely can't meet as a management team for updates, I gather findings from inspections and IAs into an email and send it "Read Receipt". I create a PDF of the email and all of the Read Receipt responses form the team and save them as that month's management meeting.

 

This is where your Continuous Improvement comes in: You've identified a gap, what are you going to do to assure it doesn't happen again?