Jump to content

  • Quick Navigation
Photo

How are companies approaching Section 2.3.2 (Specifications) in SQF Code 9.0

Share this

  • You cannot start a new topic
  • Please log in to reply
7 replies to this topic

r.bub

    Grade - AIFSQN

  • IFSQN Associate
  • 25 posts
  • 0 thanks
0
Neutral

  • United States
    United States

Posted 13 May 2021 - 10:40 PM

I am working on creating a policy to meet the requirements of SQF Code 9.0 - 2.3.2 (Specifications) and am wondering how others are approaching this.  I would like to create a general policy then have supplemental documents if needed, but there are so many things covered in this section with the new edition (raw materials, finished products, and contract services) that I don't know if a general policy will work. Additionally, can anyone provide recommendations on how to handle 2.3.2.5 - which requires approved raw material suppliers to notify the site of changes in product composition that could have an impact on product formulation?  We purchase many of our raw materials from food ingredients distributors and request specifications annually as part of our Approved Supplier Program, but I'm finding that many of these suppliers require a signed agreement in order to notify us of changes.  Is it enough that we ask for specs annually and periodically review them against specs listed on COA's?



foodsafetymuse

    Grade - Active

  • IFSQN Associate
  • 11 posts
  • 6 thanks
2
Neutral

  • United States
    United States
  • Gender:Not Telling
  • Location:Milwaukee, WI

Posted 15 May 2021 - 10:17 PM

Hi r.bub,

  • Do all of your suppliers provide COAs?
  • What information exactly is provided on the COA and
  • is this information a standard requirement?
  • What would be the corrective action if a supplier does not provide a COA with a shipment?
  • Is this feasible for the receiver to spend time comparing against the specification for every shipment?

Food Safety Muse

@@food_muse

 


r.bub

    Grade - AIFSQN

  • IFSQN Associate
  • 25 posts
  • 0 thanks
0
Neutral

  • United States
    United States

Posted 17 May 2021 - 08:17 PM

Hi foodsafetymuse,

 

Responses to your questions:

 

  • Do all of your suppliers provide COAs? - YES - when applicable (e.g. ingredients, processing aids, packaging suppliers send COCs)
  • What information exactly is provided on the COA and
  • is this information a standard requirement? Information on the COA's correlates to specifications received from the Supplier.  Some of the COAs we receive list the specifications on then, but some do not.  Most reference analytical testing an microbiological testing results.  
  • What would be the corrective action if a supplier does not provide a COA with a shipment?  If a shipment comes in without a COA, our shipping :& receiving personnel document on our inbound load inspection form and notify purchasing so a COA can be requested.  We are currently in the process of implementing an ERP system.  When this is done, all incoming materials will be placed on hold until the COA is reviewed and approved by the QA Department.
  • Is this feasible for the receiver to spend time comparing against the specification for every shipment? If it absolutely needed to be done, it could, but it would probably be quite an adjustment for our QA department.


Spidey

    Grade - MIFSQN

  • IFSQN Member
  • 208 posts
  • 81 thanks
96
Excellent

  • United States
    United States
  • Gender:Female

Posted 17 May 2021 - 10:07 PM

My company compares COAs to Specification Sheets on file for all raw materials received.  When using this process, we have found one parameter change that the manufacturer didn't inform us of, however, the change was immaterial to our process and didn't affect food safety.



Thanked by 1 Member:

OrRedFood

    Grade - MIFSQN

  • IFSQN Member
  • 110 posts
  • 24 thanks
30
Excellent

  • United States
    United States

Posted 30 June 2021 - 11:10 PM

Spidey - Does the comparison of COAs to spec sheet for each raw material received cover the new portion of SQF 9.0 section 2.3.2.5, requiring that suppliers notify you of a change inn raw material that affect food safety? Or did you have to do something else? Thank you in advance.  



Charles.C

    Grade - FIFSQN

  • IFSQN Moderator
  • 20,542 posts
  • 5662 thanks
1,544
Excellent

  • Earth
    Earth
  • Gender:Male
  • Interests:SF
    TV
    Movies

Posted 01 July 2021 - 12:33 AM

Spidey - Does the comparison of COAs to spec sheet for each raw material received cover the new portion of SQF 9.0 section 2.3.2.5, requiring that suppliers notify you of a change inn raw material that affect food safety? Or did you have to do something else? Thank you in advance.  

 

2 + 2 = 5 ?.


Kind Regards,

 

Charles.C


OrRedFood

    Grade - MIFSQN

  • IFSQN Member
  • 110 posts
  • 24 thanks
30
Excellent

  • United States
    United States

Posted 16 June 2022 - 12:02 AM

2 + 2 = 5 ?.

Charles - I find myself back at this topic, and I'm afraid I don't understand your reply. Am I misinterpreting it as a bit of sarcasm? I was referring to the part of the SQF code which states that suppliers be aware of the necessity to inform us of any specification change or characteristic that may affect product formulation, in 2.3.2.5. We have requested that suppliers notify us of formulation changes, but as a small company which purchases from manufacturers, distributors, and warehouses, this is often ignored .

 

We often find out about changes by seeing different parameters listed on COAs and don't have the buying power of a Nestle and such to demand that we get notification.  



mgourley

    Grade - FIFSQN

  • IFSQN Fellow
  • 1,403 posts
  • 997 thanks
274
Excellent

  • United States
    United States
  • Gender:Male
  • Location:Plant City, FL
  • Interests:Cooking, golf, firearms, food safety and sanitation.

Posted 16 June 2022 - 01:47 AM

If the code requires that suppliers be aware of the necessity to inform you of any spec change, it would seem to me that a simple form letter to all of your suppliers stating that requirement would suffice.

 

Now, whether or not they actually do inform you, is another matter. But that's not what the code requires, is it?

 

I would think if you can provide an auditor evidence that you have informed your suppliers of the requirement, you have done what the code specifies.

 

I'm not familiar with the specifics of the SQF code, so those that are, feel free to jump in here.

 

Marshall



Thanked by 1 Member:


Share this


0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users