Nathalie2019

    Grade - Active

  • IFSQN Active
  • 11 posts
  • 0 thanks
0
Neutral

  • Poland
    Poland

Posted 30 November 2022 - 05:59 PM

Twice a week, we join a metal detector to the production line. On other days the detector is not used - it is disconnected from the line. We don't use it. According to BRC v.9, is the metal detector a static equipment (clause 4.6.4) or mobile equipment (clause 4.6.6)? How should we consider it?



olenazh

    Grade - FIFSQN

  • IFSQN Fellow
  • 1,364 posts
  • 439 thanks
432
Excellent

  • Canada
    Canada
  • Gender:Female
  • Location:Toronto
  • Interests:My job, church, reading, gym, horror movies

Posted 30 November 2022 - 06:18 PM

If it remains on the same place (regardless it's connected to the line or disconnected) it's static. If you move it from one place to another (e.g. from line 1 to line 2) - it's mobile. 



Thanked by 2 Members:

Rosaleen

    Grade - Active

  • IFSQN Active
  • 6 posts
  • 0 thanks
0
Neutral

  • United Kingdom
    United Kingdom

Posted 06 January 2023 - 12:19 PM

HI, Has anyone a procedure for moving static equipment. please 



Leila Burin

    Grade - MIFSQN

  • IFSQN Member
  • 154 posts
  • 45 thanks
20
Excellent

  • Spain
    Spain

Posted 06 January 2023 - 02:43 PM

Hello Nathalie,

according to the interpretation Guideline: "Static equipment is defined as pieces of equipment that are not ordinarily moved or are moved only in exceptional circumstances; for example, due to redesign of the production area, relocation to another site or necessary maintenance that cannot be completed in situ"

 

Then, it is NOT  a mobile equipment. 

I hope to clear this out,

best regards,

Leila



Thanked by 1 Member:

Nathalie2019

    Grade - Active

  • IFSQN Active
  • 11 posts
  • 0 thanks
0
Neutral

  • Poland
    Poland

Posted 10 February 2023 - 04:47 PM

HI, Has anyone a procedure for moving static equipment. please 

Hi,

 

The procedure may include:

  • the type of equipment to be moved

  • how the movement will occur (e.g. whether specialist equipment or contractors are

    required)

  • requirements for re-installation

  • authorisation (which staff are authorised to permit movement)

  • responsibility (which staff will be responsible for managing the movement)

  • staff training (e.g. on the procedure to ensure they understand the risks involved)

  • records required to demonstrate all necessary controls were completed

  • post-movement cleaning (see, for example, clause 4.7.4).