Jump to content

  • Quick Navigation
Photo

Could your food safety controls work through a 48-hour digital outage?

Share this

  • You cannot start a new topic
  • Please log in to reply
6 replies to this topic

csafi

    Grade - Active

  • IFSQN Active
  • 5 posts
  • 0 thanks
0
Neutral

  • Earth
    Earth

Posted 17 September 2026 - 08:57 AM

A question I would value the forum's honest view on.
 

Most of our food safety controls now depend on digital systems, temperature monitoring, process control, traceability, automated record-keeping. But what actually happens to food safety if those systems go down for a day or two, whether from a cyber incident, a ransomware lockout, or even a major IT failure?
 

A few things I am curious about:

  • Does your HACCP or food safety plan account for extended loss of digital systems?
  • Do you keep any manual or paper fallback for critical records (CCPs, temperatures, traceability)?
  • Have you ever had to run "manual mode" in a real situation, and what did you learn?

For transparency, I am with CSAFI, a non-profit focused on cyber resilience in the food industry. We are running a free executive briefing on exactly this topic, cyber risk and the insurance blind spot for food producers, on 24 September. It is complimentary and the recording is shared with everyone who registers:
 

Mainly, though, I would genuinely like to hear how others here have planned for this, or not.


Edited by Simon, 17 September 2026 - 01:32 PM.

  • 0

GMO

    Grade - FIFSQN

  • IFSQN Fellow
  • 4,879 posts
  • 1055 thanks
646
Excellent

  • United Kingdom
    United Kingdom

Posted 17 September 2026 - 01:36 PM

No, I wouldn't consider this in a HACCP plan but I'd consider it in two - four other places. 

 

Firstly it's a potential consequence of a food defence / cyber attack so whether I consider IT threat and food defence threat separately, they'd be in these plans. I'd also consider it within my crisis documentation and lastly (if a separate document) within the business continuity plans.

 

You have got me thinking though, should BCP plans for revised working procedures be put through a HACCP plan. Possibly. It really depends how different it is vs normal operation. So for example, for many plants it will be switching from electronic to manual paperwork. Does this matter for most production plants? Probably not. Does it matter for a highly automated warehouse? Maybe. If you're having to move to manual cooking processes when they're normally automated, then that probably requires even more consideration.

 

Some factories I've worked in could cope, some couldn't. It's not just food safety though that would stop you. Sometimes it's being able to order ingredients and invoice customers.

 

I'm not sure it's an insurance blind spot for businesses. If anything, it's the risk most businesses have considered for food defence and BCP risk. Everyone has a story of at least one company which is close enough to theirs that has been hit with a cyber attack. Making it feel real enough to them to act.


  • 0

************************************************

I'm not quite as fat as my picture would suggest. The camera adds pounds. Just how many cameras are on me?  :roflmao:


Thanked by 1 Member:

jfrey123

    Grade - FIFSQN

  • IFSQN Fellow
  • 1,491 posts
  • 379 thanks
693
Excellent

  • United States
    United States
  • Gender:Male
  • Location:Nevada

Posted 17 September 2026 - 03:47 PM

Detailing for this would be covered in my Crisis Management Program, and we spell out how to begin manual verifications of the automated/digital systems.  For our sites with a WMS integrated into shipping, receiving, storage for example, the CMP spells out how to continue receiving/shipping on manual records along with logging storage placement and pulls, with the plan calling for the WMS to be updated from those logs when access is restored.  If we lose our automated temp loggers in the refrigerated/frozen areas, we start sending QA techs to record the temperatures at each thermometer manually.  As I sit here and type though, I'm realizing we probably don't have a set of labels pre-printed in a binder to manually check if the digital specs weren't available.  I'll have to pass that up to have my sites explore the gap...

 

For these manual checks, you need a pre-printed set of paper hard copy forms to document your manual activities/checks of the previously digitized systems (because in a digital crisis I would assume loss of access to all things computer based, so not printing what you need off the company server on the spot).  I find keeping a cleanly printed set in a binder with those plastic sleeve inserts works well to keep them ready to photocopy.


  • 0

Thanked by 1 Member:

Scampi

    Fellow

  • IFSQN Fellow
  • 6,491 posts
  • 1747 thanks
2,102
Excellent

  • Canada
    Canada
  • Gender:Not Telling

Posted 17 September 2026 - 07:29 PM

Covered during mock crisis          we have a usb with blank records, a generic email address ready and a back up laptop NOT connected to the server

 

it would be a massive headache, and we figure we need 48 hours to get back to full production

 

Mock crisis are sometimes a real pain in the a** , but this exercise was worth doing 


  • 0

Please stop referring to me as Sir/sirs


Thanked by 1 Member:

jfrey123

    Grade - FIFSQN

  • IFSQN Fellow
  • 1,491 posts
  • 379 thanks
693
Excellent

  • United States
    United States
  • Gender:Male
  • Location:Nevada

Posted 18 September 2026 - 03:48 PM

Mock crisis are sometimes a real pain in the a** , but this exercise was worth doing 

 

Quoting just to echo this.  They're a pain and can feel like a waste of time, but if you wholly commit to it you can find real gaps in your programs that could really screw your company or your consumers should they actually happen.

 

I'll also add: Always do your best to actually involve your crisis management team, don't just write something up and throw it in the binder to check a checkbox.  Sit them down for an hour and present a scenario, and start gaming it out.  Point at that production manager and tell him, "We just lost power to the building, what are you going to do?  Shipping dept, those trucks we're loading are now locked to our building, what do we do?  QA, is someone checking that the temp monitor backup batteries are running?  Maintenance, can we rent a generator to power the refrigeration units?"  Getting everyone's brain working the same problem attacks it from multiple levels and gets solutions you can record into the plan itself, so when the power drops, there's written steps that your team has already explored.


Edited by jfrey123, 18 September 2026 - 03:48 PM.

  • 0

Thanked by 1 Member:

GMO

    Grade - FIFSQN

  • IFSQN Fellow
  • 4,879 posts
  • 1055 thanks
646
Excellent

  • United Kingdom
    United Kingdom

Posted 18 September 2026 - 06:59 PM

I'll also add: Always do your best to actually involve your crisis management team, don't just write something up and throw it in the binder to check a checkbox.  Sit them down for an hour and present a scenario, and start gaming it out.  

 

Even better, if you can, get someone else to run it for you, so you can be part of the simulation. Don't just make simulations "obvious" food safety risks either. They can be jointly run with EHS and have food safety risks which are incidental because of the incident or recovery. E.g. a person getting rescued from a high care area after an accident.

 

If you're a multi site operation, perhaps get a group person or another site leader to do a scenario for you or your insurer might support it.


  • 0

************************************************

I'm not quite as fat as my picture would suggest. The camera adds pounds. Just how many cameras are on me?  :roflmao:


Thanked by 1 Member:

LostInTheWoods

    Grade - MIFSQN

  • IFSQN Member
  • 115 posts
  • 9 thanks
37
Excellent

  • Earth
    Earth

Posted 18 September 2026 - 07:36 PM

It would likely depend on the extent of the outage.

 

All of our production takes place on computer controlled valves, tanks, etc., but those are decoupled from our traditional "offfice" IT environment. All of our official batch records are on paper (largely due to Part 11 compliance questions).

 

If our production network went down, we would be dead in the water. We wouldn't be able to produce, let alone document anything. If we lost the office network, we'd still be able to process what's in progress, as the forms would have already been printed.


  • 0

Thanked by 1 Member:


Share this


Also tagged with one or more of these keywords: food safety, business continuity, cyber security, HACCP, risk management, food defense

0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users