Jump to content

  • Quick Navigation
Photo

AIB 5.22 - Specification Program

Share this

  • You cannot start a new topic
  • Please log in to reply
4 replies to this topic
- - - - -

paconmatt

    Grade - AIFSQN

  • IFSQN Associate
  • 33 posts
  • 1 thanks
0
Neutral

  • United States
    United States

Posted 27 June 2014 - 09:12 PM

In 5.22 of the AIB consolidated standards it states, "  the facility has written specifications..........records are maintained".   What type of written specifications are they talking about?  What records would the inspector expect to see?  There isn't much information to go on in this section can someone please clarify this for me.  Thank you.



Snookie

    Grade - FIFSQN

  • IFSQN Fellow
  • 1,625 posts
  • 267 thanks
174
Excellent

  • United States
    United States
  • Gender:Female

Posted 27 June 2014 - 10:33 PM

It has been a really long time since I have done AIB and I don't have the standard in front of me.....but written specifications usually refers to having written specifications for incoming materials and/or ingredients.  Written specifications are usually kept on final product as well.  So for example in your case it may be something like our is size A and the tolerance is plus or minus B.  Records would be whatever documents use such as receiving document or production documents showing that your specifications were met. 


Posted Image
Live Long & Prosper

fgjuadi

    Grade - PIFSQN

  • Banned
  • 898 posts
  • 203 thanks
28
Excellent

  • United States
    United States
  • Gender:Male

Posted 28 June 2014 - 12:49 AM

Written specification for raw materials, packaging materials, processing aids, work in progress, and finished product 

- AIB Standard Required Documentation Appendix


Edited by magenta_majors, 29 June 2014 - 01:58 PM.

.--. .- -. - ... / --- .--. - .. --- -. .- .-..

Dharmadi Sadeli Putra

    Grade - MIFSQN

  • IFSQN Member
  • 161 posts
  • 26 thanks
7
Neutral

  • Indonesia
    Indonesia
  • Gender:Male

Posted 28 June 2014 - 07:28 AM

And all quality records that proof your raw materials, ingredients, packagings, finished goods are met to specifications ( including Non Conformance Report if any deviation found).



Charles.C

    Grade - FIFSQN

  • IFSQN Moderator
  • 20,542 posts
  • 5662 thanks
1,544
Excellent

  • Earth
    Earth
  • Gender:Male
  • Interests:SF
    TV
    Movies

Posted 28 June 2014 - 10:48 PM

Dear paconmatt,

 

How do your QA control raw materials when they arrive ?

Answer - they have specifications.

 

How do yr Purchasing Dept decide on which raw material Quality is needed?                   /

Answer - they have specifications.

 

At least the Auditor will expect them to because it should be the 1st document a Production line has to produce. Except that it's often scribbled on the back of a postcard. :smile:

 

if you wish to see some sample specification documents for ingredients and packaging, try searching for the model yoghurt haccp plan. There's about half a dozen in the thread.

 

Rgds / Charles.C


Kind Regards,

 

Charles.C




Share this

1 user(s) are reading this topic

0 members, 1 guests, 0 anonymous users