Jump to content

  • Quick Navigation
Photo

Preventative and planned maintenance in bakery

Share this

  • You cannot start a new topic
  • Please log in to reply
4 replies to this topic

Dr.Khan

    DR

  • IFSQN Senior
  • 314 posts
  • 132 thanks
28
Excellent

  • Australia
    Australia
  • Gender:Male
  • Location:Sydney
  • Interests:Food, Reading technical information,provding technical help in QA,R&D,staff Training, products and processes optimisation, watching documentaries and making presentations
    AM available as consultant in Quality Assurance, Product & process development/ optimisation, staff training and trouble shooting in complex manufacturing Environment

    Cal me on +61411588329 to discuss your requirements.

    Am available for International Assignments

Posted 03 February 2016 - 11:35 PM

Hi

 

  I have developed and implemented Registers or preventative and planned maintenance. Would like some help in writing a procedure for conducting the maintenance.

 

Regards

Humaid Khan 



RMAV

    Grade - SIFSQN

  • IFSQN Senior
  • 407 posts
  • 122 thanks
44
Excellent

  • United States
    United States
  • Gender:Male
  • Location:USA - Midwest
  • Interests:QA, Micro, Sanitation;
    Meats, Juice, Condiments;
    SQF, Audit, and aviation

Posted 04 February 2016 - 04:30 PM

Some basic elements I put in place for both preventative maintenance and for urgent repairs:

 

-whether the work poses a contamination risk to the area on which work is done or to adjacent areas (protect the area as needed)

-follow chemical and lubricant policy and use only approved materials

-guidelines for temporary repair (no duct tape, cloth ties, material that can cause or harbor contamination, etc.)

-tool and material accountability

-whether or not the equipment requires cleaning following the work (trained person completes the cleaning step with approved cleaners/sanitizers)

-inspection of the area and equipment following work (no wires left on the floor, no nuts/bolts, tools left out, etc) - QA and maint personnel complete inspection

-positive release of the area/equipment following inspection



Charles.C

    Grade - FIFSQN

  • IFSQN Moderator
  • 20,542 posts
  • 5662 thanks
1,544
Excellent

  • Earth
    Earth
  • Gender:Male
  • Interests:SF
    TV
    Movies

Posted 04 February 2016 - 05:58 PM

Some basic elements I put in place for both preventative maintenance and for urgent repairs:

 

-whether the work poses a contamination risk to the area on which work is done or to adjacent areas (protect the area as needed)

-follow chemical and lubricant policy and use only approved materials

-guidelines for temporary repair (no duct tape, cloth ties, material that can cause or harbor contamination, etc.)

-tool and material accountability

-whether or not the equipment requires cleaning following the work (trained person completes the cleaning step with approved cleaners/sanitizers)

-inspection of the area and equipment following work (no wires left on the floor, no nuts/bolts, tools left out, etc) - QA and maint personnel complete inspection

-positive release of the area/equipment following inspection

 

Hi RMAV,

 

thks for above.

 

Is this a generic menu or specifically targeted for bakeries ?.

 

Not my area but based on some recent posts, i would have added to maintain a vigilance for aluminium shavings due degrad(ed)ing tray/shelving alignments.


Kind Regards,

 

Charles.C


RMAV

    Grade - SIFSQN

  • IFSQN Senior
  • 407 posts
  • 122 thanks
44
Excellent

  • United States
    United States
  • Gender:Male
  • Location:USA - Midwest
  • Interests:QA, Micro, Sanitation;
    Meats, Juice, Condiments;
    SQF, Audit, and aviation

Posted 04 February 2016 - 06:41 PM

Apologies, Charles.C, I usually add a disclaimer. I provided a generic list of what I look for but I don't have experience in Bakery or BRC.

 

That's a good point with the shavings.  Something to watch for in preventative maintenance or repairs is will there be any cutting, drilling, filing, etc., where will the work occur, etc...



Charles.C

    Grade - FIFSQN

  • IFSQN Moderator
  • 20,542 posts
  • 5662 thanks
1,544
Excellent

  • Earth
    Earth
  • Gender:Male
  • Interests:SF
    TV
    Movies

Posted 04 February 2016 - 07:02 PM

Hi RMAV,

 

No problem, I was just curious. The more, the merrier. :smile:

 

I agree that many of the necessities are undoubtedly groupable.


Kind Regards,

 

Charles.C