I line with the Tesco COP, I am about to undertake a RA of our water systems including source, supply, etc. Can any of you guys give me a foot up on this one, has anyone done a water RA I could take a look at.

I am sure there are plenty of Tesco producers out there.

Kind regards


Mike



Charles.C

    Grade - FIFSQN

  • IFSQN Moderator
  • 20,542 posts
  • 5665 thanks
1,544
Excellent

  • Earth
    Earth
  • Gender:Male
  • Interests:SF
    TV
    Movies

Posted 30 September 2010 - 07:13 PM

dear caddyshack,

I'm no tesco affiliate but a modicum of basic info might perhaps help people eg -

product / process
water source - quality / safety validated to standard XXX
any pre-treatment before use in process(es) - risk of contamination / legality (eg chlorination) ?
water entering production areas - quality / safety validated
risk of back-syphoning ?
input / output lines colour coded
also used for ice ??

Rgds / Charles.C


Kind Regards,

 

Charles.C


Simon

    IFSQN...it's My Life

  • IFSQN Admin
  • 12,831 posts
  • 1363 thanks
881
Excellent

  • United Kingdom
    United Kingdom
  • Gender:Male
  • Location:Manchester
  • Interests:Married to Michelle, Father of three boys (Oliver, Jacob and Louis). I enjoy cycling, walking and travelling, watching sport, especially football and Manchester United. Oh and I love food and beer and wine.

Posted 03 October 2010 - 07:38 PM

Any more thoughts on this?


Get FREE bitesize education with IFSQN webinar recordings.
 
Download this handy excel for desktop access to over 180 Food Safety Friday's webinar recordings.
https://www.ifsqn.com/fsf/Free%20Food%20Safety%20Videos.xlsx

 
Check out IFSQN’s extensive library of FREE food safety videos
https://www.ifsqn.com/food_safety_videos.html


Tony-C

    Grade - FIFSQN

  • IFSQN Fellow
  • 4,224 posts
  • 1292 thanks
610
Excellent

  • United Kingdom
    United Kingdom
  • Gender:Male
  • Location:World
  • Interests:My main interests are sports particularly football, pool, scuba diving, skiing and ten pin bowling.

Posted 04 October 2010 - 04:44 AM

I line with the Tesco COP, I am about to undertake a RA of our water systems including source, supply, etc. Can any of you guys give me a foot up on this one, has anyone done a water RA I could take a look at.
I am sure there are plenty of Tesco producers out there.

Kind regards

Mike


Each site will be different. Make a checklist from the requirements in the TESCO COP:

A risk assessment must be completed on water safety/quality. Assessment includes the consideration of Legionellla.
The composition of water delivered to the site must be known and the standard required for use in production (whether as water, ice or steam) as an ingredient, for cleaning or other uses must be defined.
The assessment scope must include source, storage, handling, treatment, impact on environment and waste management.
Water may be sourced from a Public (mains) supply or from a private source.
Water used in processing food, as an ingredient or for cleaning must be potable. Potability must meet local requirements at a minimum.
If non potable water is used on site it must be segregated and controlled e.g. for toilet flushing.
Potability testing must be completed by accredited laboratories covering microbiological, chemical and physical parameters.
Where water is from a Public supply, certificates of potability from the provider are acceptable. Although additional testing may be required based on risk assessment.
Where water is from a private source, the potability must be demonstrated on a continuing basis. Certificates of potability must be provided (minimum 6 monthly).
Ice manufactured on site must be tested for microbiological levels (minimum bi-annually).
Purchased ice must have an annual certificate of potability.
Potable water in high care / high risk areas must be tested for microbiological levels (minimum monthly).
All points on the ring main system should be included on a water testing schedule.
Where water treatments are in place they must be monitored to ensure they remain effective through monitoring of critical parameters.
A site using chlorination as a treatment has a system in place to monitor and record dosing levels, free and total chlorine and pH during use.
Automated controls and an alarm mechanism should be in place to notify management if levels fall outside set limits.
There must be a schematic plan of all water circuits within the site which is reviewed annually.
Potable and non-potable water lines must be identified throughout the site.
All pipes and fixtures must be designed from material suitable for the purpose and kept in good condition.
Dead ends on potable water lines must be eliminated.
Bulk water storage facilities must be constructed from approved materials, of a size that prevents stagnation and designed to exclude light and pest entry.
Tanks must be inspected and cleaned at frequencies determined by risk assessment.
There must be a backflow prevention device fitted to main water lines and on individual lines within production areas.
All steam used for product manufacture or in contact with product contact surfaces must be from “potable” sources. Documentation must be available that indicates all boiler components meet approved boiler additive standards.
Sewage disposal must not compromise food safety or employee health.
Waste water and sewer drains must not be vented inside the facility.


Regards,

Tony


Charles.C

    Grade - FIFSQN

  • IFSQN Moderator
  • 20,542 posts
  • 5665 thanks
1,544
Excellent

  • Earth
    Earth
  • Gender:Male
  • Interests:SF
    TV
    Movies

Posted 04 October 2010 - 05:48 AM

Dear All,

Given their recent experiences with mice bread (although apparently no designated corrective action), nice to see that Tesco include a specific element regarding water storage protection from vermin in their compendium of requirements. This might be usefully extended to the source / inputs also ? :unsure: