Line Clearance procedure during maintenance works

Share this

  • You cannot start a new topic
  • Please log in to reply
6 replies to this topic
- - - - -

gandd

    Grade - Active

  • IFSQN Active
  • 7 posts
  • 0 thanks
0
Neutral

  • Scotland
    Scotland

Posted 15 November 2016 - 08:18 AM

Hi,

 

I work in a printers making labels etc for the food and drink industry. I need to write a procedure for line clearance during maintenance works. Can anyone give me a starter for 10 please?

 

Thanks, Ali



Polin

    Grade - AIFSQN

  • IFSQN Associate
  • 40 posts
  • 9 thanks
0
Neutral

  • Greece
    Greece

Posted 16 November 2016 - 08:18 AM

hello Ali,

 

I will introduce you the way that we document the line clearance at our System.

 

We have a general GMP guidance for the production staff where among other mentioned that after a maintenance work, all the working tools, swarf and other contamination hazards should removed and the equipment should cleaned. Furthermore we have a column "line clearance" at our maintenace register, where the operator declare that the the line is cleared. After that the production manager check and sign to resume production.

 

This is our procedure and till now we have not faced any conformance problem with the inspectors.

 

Polin 



Thanked by 5 Members:
Ana_B , gandd , Pipa , teresa gonçalves , Charles.C

dlj

    Grade - Active

  • IFSQN Active
  • 13 posts
  • 13 thanks
0
Neutral

  • United Kingdom
    United Kingdom

Posted 17 November 2016 - 09:10 AM

Hi Ali,

 

Attached File  hygiene log.xlsx   12.98KB   697 downloadsHi Ali, I have used the attached for sometime and never had any problems from auditors



Thanked by 5 Members:
Serena :) , gandd , teresa gonçalves , katilaik , Charles.C

Foodworker

    Grade - SIFSQN

  • IFSQN Senior
  • 353 posts
  • 234 thanks
32
Excellent

  • United Kingdom
    United Kingdom

Posted 17 November 2016 - 10:15 AM

Good Morning Ali,

 

I'm guessing you have just had your BRC and got caught out by the tweak in wording for Issue 5 on maintenance.

 

There should be no need to write a complete procedure for clearance following maintenance, a couple of paragraphs in a general maintenance procedure should suffice.

 

The thing to remember that the clause requires a record in addition to the procedure and this is where it can get tricky. Maintenance mostly comes in three types: 

 

  1. Work done by contractors
  2. Planned maintenance work by your own staff
  3. Emergency/breakdown repaired by either tour own staff or contractors.

 

You will need to capture clearance after each of these types.Planned work by contractors or your own staff will normally involve a line shutdown of some level. You may have a line start up record that you can modify to record the clearance. Alternatively I have seen rubber stamps being used with a signature on paperwork with a suitable phrase such as " equipment checked and is free from materials and is safe and clean to use" The procedure should define who can give this authority.

 

Breakdown work is where I have seen the clearance record missed most

 

Here is an example procedure and record sheet.

 

 

 

 

Attached Files



Thanked by 8 Members:
fsafety15 , selmaassili , gandd , chu lin , teresa gonçalves , rmills06 , katilaik , Charles.C

DN_QAMGR

    Grade - MIFSQN

  • IFSQN Member
  • 67 posts
  • 37 thanks
8
Neutral

  • United States
    United States
  • Gender:Male
  • Location:California

Posted 23 November 2016 - 05:05 PM

Hi, I have a huge issue with line clearance and responsibility. To satisfy BRC requirements, there are work orders made for every job. I added clearance sign off and verification onto my work order form. 

 

This has satisfied my BRC auditor.

 

attached is my work order form.

 

My SOP states that all work performed will have a work order and describes the steps of clearing on the work order.

 

The Contractor's work and Preventative Maintenance clearance procedures are verified by the Company representative which documents on the log/invoice itself. 

 

Keep in mind, training is key and you should review their documents if possible, annually or monthly. 

 

 

Attached Files



Thanked by 4 Members:
fsafety15 , Teem , gandd , chu lin

Manoj SN

    Grade - Active

  • IFSQN Associate
  • 5 posts
  • 0 thanks
1
Neutral

  • India
    India
  • Gender:Male
  • Location:KARNATAKA

Posted 15 October 2022 - 04:16 AM

Can anyone please share "post maintenance line clearance checklist" which suitable for the Food industry.

Thanks in advance.

 

--

Regards,

Manoj SN



Charles.C

    Grade - FIFSQN

  • IFSQN Moderator
  • 20,542 posts
  • 5665 thanks
1,544
Excellent

  • Earth
    Earth
  • Gender:Male
  • Interests:SF
    TV
    Movies

Posted 15 October 2022 - 10:35 AM

Can anyone please share "post maintenance line clearance checklist" which suitable for the Food industry.

Thanks in advance.

 

--

Regards,

Manoj SN

Hi Manoj,

 

Generic Attachments in Posts - 3,4.5 ?


Kind Regards,

 

Charles.C