Jump to content

  • Quick Navigation
Photo

Need clarity on ISO 22000 clause 7.3.5.2.

Share this

  • You cannot start a new topic
  • Please log in to reply
4 replies to this topic
- - - - -

Rebecca123

    Grade - Active

  • IFSQN Active
  • 20 posts
  • 0 thanks
0
Neutral

  • South Africa
    South Africa

Posted 13 July 2017 - 12:34 PM

Hi all

 

I need clarity on ISO 22000 clause 7.3.5.2.

 

do I need to write down all the process steps first, than identify the potential hazard than from that step identify the control measures?



Madam A. D-tor

    Grade - PIFSQN

  • IFSQN Principal
  • 644 posts
  • 230 thanks
52
Excellent

  • Netherlands
    Netherlands
  • Gender:Female
  • Interests:meat, meat products, ready to eat, food safety, QMS, audits, hazard analyses, IFS, BRC, SQF, HACCP, ISO 9001, ISO 22000

Posted 13 July 2017 - 12:42 PM

Yes.


Kind Regards,

Madam A. D-tor

Thanked by 1 Member:
Rebecca123

Madam A. D-tor

    Grade - PIFSQN

  • IFSQN Principal
  • 644 posts
  • 230 thanks
52
Excellent

  • Netherlands
    Netherlands
  • Gender:Female
  • Interests:meat, meat products, ready to eat, food safety, QMS, audits, hazard analyses, IFS, BRC, SQF, HACCP, ISO 9001, ISO 22000

Posted 13 July 2017 - 01:20 PM

dear Rebecca,

 

Sorry! that was too short answer.

 

First you describe your process in the flow charts. indicating each step, including interaction, rework, recycling, by-products, waste and packaging materials (7.3.5.1)

You also need to record the parameters, e.g. temperature, pressure, time, etc. (7.3.5.2) You can do this in the flow charts, in instruction, in a separate document or anything that fits your organization. Probably the parameters are already known for your processes.

 

After that you document for each process step which potential hazards are involved. (7.4.2.1) hazard identification.

For each hazard you name the control measure that is already in place (7.3.5.2)

After that start the hazard assessment (7.4.3).

 

When you do it in this order you are sure not to miss any control measures that are already in place.

 

Good luck.


Kind Regards,

Madam A. D-tor

Thanked by 1 Member:
Rebecca123

Charles.C

    Grade - FIFSQN

  • IFSQN Moderator
  • 20,542 posts
  • 5662 thanks
1,544
Excellent

  • Earth
    Earth
  • Gender:Male
  • Interests:SF
    TV
    Movies

Posted 13 July 2017 - 01:21 PM

Hi all

 

I need clarity on ISO 22000 clause 7.3.5.2.

 

do I need to write down all the process steps first, than identify the potential hazard than from that step identify the control measures?

 

Hi Rebecca,

 

Can have a look at this model plan -

 

http://www.ifsqn.com...so-22000-73-744

 

(this was addtionally targeted at fssc22000 but that only automated the selection of PRPs)


Kind Regards,

 

Charles.C


Thanked by 1 Member:
Rebecca123

Rebecca123

    Grade - Active

  • IFSQN Active
  • 20 posts
  • 0 thanks
0
Neutral

  • South Africa
    South Africa

Posted 14 July 2017 - 05:34 AM

Hi Rebecca,

 

Can have a look at this model plan -

 

http://www.ifsqn.com...so-22000-73-744

 

(this was addtionally targeted at fssc22000 but that only automated the selection of PRPs)

Hi Charles

 

the information you sent me is very helpful.

 

I went through the conversations and all the attached docs and they were very helpful.

 

I will upload my docs once I complete them for you guys to assess and find gaps.

 

Thanks again.

 

:king:  :king:  :king:





Share this

0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users