Jump to content

  • Quick Navigation
Photo

Scope of validation and verification procedures

Share this

  • You cannot start a new topic
  • Please log in to reply
3 replies to this topic
- - - - -

mohamed ahmed yusuf

    Grade - MIFSQN

  • IFSQN Member
  • 190 posts
  • 40 thanks
17
Good

  • Egypt
    Egypt
  • Gender:Male
  • Interests:Reading, Listening music, handball , volleyball, food safety, drawing , R&D, Photoshop

Posted 15 September 2018 - 06:09 AM

Hello Dears , 

I have an inquiry about Validation and verification ,is the whole plant should have a general Validation and verification procedure ? and this procedure to be included in everything or each department should have their own one like food safety especially should have their own procedures. 

If you please have any material could support me and solve this issue please share. 

Kind Regards

Mohamed 


M.Yusuf


Brendan Triplett

    Grade - PIFSQN

  • IFSQN Principal
  • 511 posts
  • 131 thanks
106
Excellent

  • United States
    United States
  • Gender:Male
  • Interests:Rugby, Military History, Reading

Posted 16 September 2018 - 02:01 AM

Mohamed,

The short answer is yes. There should be validation and verification in every system element for your company. That is to say that an example would be that you should have a process in place that ensures that your pest control plan is in place and that someone is checking it and then you should make sure that the plan is effective. The idea here is to answer two questions, 1) Validation answers - what is the plan in place 2) Verification answers - is it getting the desired results. Hope this helps.

Cheers!


  • mohamed ahmed yusuf likes this

Vice President and SQF Practitioner in Pennsylvania
Brendan Triplett


Thanked by 1 Member:
mohamed ahmed yusuf

mohamed ahmed yusuf

    Grade - MIFSQN

  • IFSQN Member
  • 190 posts
  • 40 thanks
17
Good

  • Egypt
    Egypt
  • Gender:Male
  • Interests:Reading, Listening music, handball , volleyball, food safety, drawing , R&D, Photoshop

Posted 16 September 2018 - 08:28 AM

Mohamed,

The short answer is yes. There should be validation and verification in every system element for your company. That is to say that an example would be that you should have a process in place that ensures that your pest control plan is in place and that someone is checking it and then you should make sure that the plan is effective. The idea here is to answer two questions, 1) Validation answers - what is the plan in place 2) Verification answers - is it getting the desired results. Hope this helps.

Cheers!

Thanks Brendan for your help :) 


Edited by mohamed ahmed yusuf, 16 September 2018 - 08:28 AM.

M.Yusuf


Brendan Triplett

    Grade - PIFSQN

  • IFSQN Principal
  • 511 posts
  • 131 thanks
106
Excellent

  • United States
    United States
  • Gender:Male
  • Interests:Rugby, Military History, Reading

Posted 16 September 2018 - 11:11 PM

Happy to help Mohamed!


  • mohamed ahmed yusuf likes this

Vice President and SQF Practitioner in Pennsylvania
Brendan Triplett




Share this

0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users