Jump to content

  • Quick Navigation
Photo

Material risk assessment when using one line to produce different products

Share this

Best Answer , 16 September 2020 - 02:08 PM

Risk assessment is done to identify potential biological, chemical, allergen and physical hazards in materials. First, you identify hazards using reference materials (I've attached some, but you might have different ones), then analyse hazards in terms of their severity, likelihood of occurrence, significance, etc. and score them (low/medium/high), then identify control measures.

 


  • You cannot start a new topic
  • Please log in to reply
4 replies to this topic
- - - - -

mohamed ahmed yusuf

    Grade - MIFSQN

  • IFSQN Member
  • 190 posts
  • 40 thanks
17
Good

  • Egypt
    Egypt
  • Gender:Male
  • Interests:Reading, Listening music, handball , volleyball, food safety, drawing , R&D, Photoshop

Posted 16 September 2020 - 01:22 PM

It's me again :D 

 

I have a question regarding the material risk assessment,

 

We have one line to produce different product ( products related to us and products related to other companies) and management is asking to do material risk assessment for it, does anyone could help by an example? 

 

All answers are welcome and appreciated 


M.Yusuf


olenazh

    Grade - FIFSQN

  • IFSQN Fellow
  • 1,364 posts
  • 439 thanks
432
Excellent

  • Canada
    Canada
  • Gender:Female
  • Location:Toronto
  • Interests:My job, church, reading, gym, horror movies

Posted 16 September 2020 - 01:36 PM

Depends on what kind of products are manufactured on the same line. If they contain/don't contain allergens, you'll need to do risk assessment to identify potential hazards, what safety measures you'll need to develop to address threats. Also, it depends, what food safety scheme you have and its requirements in terms of material risk assessment. Your question is too vague


  • mohamed ahmed yusuf likes this

mohamed ahmed yusuf

    Grade - MIFSQN

  • IFSQN Member
  • 190 posts
  • 40 thanks
17
Good

  • Egypt
    Egypt
  • Gender:Male
  • Interests:Reading, Listening music, handball , volleyball, food safety, drawing , R&D, Photoshop

Posted 16 September 2020 - 01:53 PM

Depends on what kind of products are manufactured on the same line. If they contain/don't contain allergens, you'll need to do risk assessment to identify potential hazards, what safety measures you'll need to develop to address threats. Also, it depends, what food safety scheme you have and its requirements in terms of material risk assessment. Your question is too vague

 

Thanks Olenazh for your answer! 

 

we are processing herbs (basil, parsley, marjoram, dill, fennel seeds) and of course there are type of allergens, but i don't know how to do this risk assessment! 


M.Yusuf


olenazh

    Grade - FIFSQN

  • IFSQN Fellow
  • 1,364 posts
  • 439 thanks
432
Excellent

  • Canada
    Canada
  • Gender:Female
  • Location:Toronto
  • Interests:My job, church, reading, gym, horror movies

Posted 16 September 2020 - 02:08 PM   Best Answer

Risk assessment is done to identify potential biological, chemical, allergen and physical hazards in materials. First, you identify hazards using reference materials (I've attached some, but you might have different ones), then analyse hazards in terms of their severity, likelihood of occurrence, significance, etc. and score them (low/medium/high), then identify control measures.

 

Attached Files


  • mohamed ahmed yusuf likes this

Thanked by 2 Members:
chu lin , Anoop Nazeer

mohamed ahmed yusuf

    Grade - MIFSQN

  • IFSQN Member
  • 190 posts
  • 40 thanks
17
Good

  • Egypt
    Egypt
  • Gender:Male
  • Interests:Reading, Listening music, handball , volleyball, food safety, drawing , R&D, Photoshop

Posted 30 September 2020 - 09:51 AM

Risk assessment is done to identify potential biological, chemical, allergen and physical hazards in materials. First, you identify hazards using reference materials (I've attached some, but you might have different ones), then analyse hazards in terms of their severity, likelihood of occurrence, significance, etc. and score them (low/medium/high), then identify control measures.

I'm grateful for your support and help, many thanks!!!!!!!!!!!!!!!!!!!


M.Yusuf




Share this

0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users