Jump to content

  • Quick Navigation
Photo

FSSC 22000 version 5.1 (2.5.13 Product development)

Share this

  • You cannot start a new topic
  • Please log in to reply
6 replies to this topic

kassiardc

    Grade - Active

  • IFSQN Active
  • 6 posts
  • 0 thanks
0
Neutral

  • Brazil
    Brazil

Posted 17 November 2020 - 01:19 PM

What would be this validation of the product formulation in the new version of FSSC 22000 version 5.1 (2.5.13 Product development)?



olenazh

    Grade - FIFSQN

  • IFSQN Fellow
  • 1,363 posts
  • 439 thanks
432
Excellent

  • Canada
    Canada
  • Gender:Female
  • Location:Toronto
  • Interests:My job, church, reading, gym, horror movies

Posted 17 November 2020 - 06:46 PM

For each new product, we conduct a plant trial in order (as it's stated in FSSC 22000 V. 5.1, subsection 2.5.13) to validate that product formulation and process are capable of producing a safe product and meet customer requirements. This plant trial is a simulation of a routine product run to observe a process and its parameters and overall how it goes, to do all necessary quality & safety checks, to conduct micro and organoleptic testing, to validate label claims, and to do the shelf life study. We've been doing it for quite a long time as per one of our customers' standard.


  • Anoop Nazeer likes this

Thanked by 3 Members:
Anoop Nazeer , Xenna , kassiardc

catherinepc

    Grade - Active

  • IFSQN Active
  • 24 posts
  • 0 thanks
0
Neutral

  • Malaysia
    Malaysia

Posted 20 November 2020 - 02:37 PM

For each new product, we conduct a plant trial in order (as it's stated in FSSC 22000 V. 5.1, subsection 2.5.13) to validate that product formulation and process are capable of producing a safe product and meet customer requirements. This plant trial is a simulation of a routine product run to observe a process and its parameters and overall how it goes, to do all necessary quality & safety checks, to conduct micro and organoleptic testing, to validate label claims, and to do the shelf life study. We've been doing it for quite a long time as per one of our customers' standard.

Hi,

 

May I know which department should involve in this validation ? 

 

Thank you



olenazh

    Grade - FIFSQN

  • IFSQN Fellow
  • 1,363 posts
  • 439 thanks
432
Excellent

  • Canada
    Canada
  • Gender:Female
  • Location:Toronto
  • Interests:My job, church, reading, gym, horror movies

Posted 20 November 2020 - 02:46 PM

Sorry, I'm here the one-man army: we're a small company - so, I'm not sure, but could guess it should be QA dpt obviously and R&D as well.



Thanked by 1 Member:
kassiardc

Xenna

    Grade - Active

  • IFSQN Active
  • 4 posts
  • 0 thanks
0
Neutral

  • Brazil
    Brazil

Posted 21 December 2020 - 01:57 PM

For each new product, we conduct a plant trial in order (as it's stated in FSSC 22000 V. 5.1, subsection 2.5.13) to validate that product formulation and process are capable of producing a safe product and meet customer requirements. This plant trial is a simulation of a routine product run to observe a process and its parameters and overall how it goes, to do all necessary quality & safety checks, to conduct micro and organoleptic testing, to validate label claims, and to do the shelf life study. We've been doing it for quite a long time as per one of our customers' standard.

 

What should be done with the product made during the plant test?

Can it be sold, or is it recommended to leave it in the reprocessing area to be used in the next productions?



snatal

    Grade - Active

  • IFSQN Active
  • 4 posts
  • 0 thanks
0
Neutral

  • Mozambique
    Mozambique

Posted 22 September 2021 - 09:14 AM

GOOD MORNING EVERYONE

I want an example for FSSC 22000: 2.5.13 - Product development Procedure can you share with us ?



Mushabe Patrick

    Grade - Active

  • IFSQN Active
  • 1 posts
  • 0 thanks
0
Neutral

  • Uganda
    Uganda

Posted 14 February 2022 - 11:40 AM

Can someone share  sample template of the product development procedure. i was audited against the v5.1 and had this as a non-conformance. I need to get it closed. someone share a template. thank you





Share this

0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users