How to Manage Traceability in Chocolate Manufacturing
Started by KBMB, May 28 2010 12:56 AM
Hello all,
I am fairly new to the site.
I am asking for input on how to trace chocolate dipping/drizzling in a commercial bakery between lot number changes of the chocolate.
The only solution I can see is to do a full clean of the tank between lot number changes but this would mean down time and waste.
Does anyone have suggestions on how to handle this?
Betts.
I am fairly new to the site.
I am asking for input on how to trace chocolate dipping/drizzling in a commercial bakery between lot number changes of the chocolate.
The only solution I can see is to do a full clean of the tank between lot number changes but this would mean down time and waste.
Does anyone have suggestions on how to handle this?
Betts.
Rotating new products monthly: how to manage specs and HACCP
How do you manage your food safety management system?
HARA Manufacturing Process Steps
ISO 22002 2025 Change Summary - Food Manufacturing
Traceability Requirements for SALSA Audits
[Ad]
Hi Betts,
thsi has been discussed previously, please check out this topic: Chocolate Manufacturing Traceability Discussion
If that does not answer your question and you have further queries please feel free to ask.
By the way welcome to the forum.
thsi has been discussed previously, please check out this topic: Chocolate Manufacturing Traceability Discussion
If that does not answer your question and you have further queries please feel free to ask.
By the way welcome to the forum.
Dear All,
I hv no direct experience of this product so I found the thread linked by Simon both fascinating and astonishing in equal amounts. As I understand, it is quite possible to have one batch equivalent to a years production !!
Surely this simply smashes all the normal requirements of a satisfactory, risk - assessed evaluation, especially since the RTE product is well-known to occasionally hv significant Salmonella problems.
I find it difficult to see how a processor manufacturing within a situation of that nature could pass a BRC audit, to name but one. Any enlightenment available ??
Rgds / Charles.C
I hv no direct experience of this product so I found the thread linked by Simon both fascinating and astonishing in equal amounts. As I understand, it is quite possible to have one batch equivalent to a years production !!
Surely this simply smashes all the normal requirements of a satisfactory, risk - assessed evaluation, especially since the RTE product is well-known to occasionally hv significant Salmonella problems.
I find it difficult to see how a processor manufacturing within a situation of that nature could pass a BRC audit, to name but one. Any enlightenment available ??
Rgds / Charles.C
Rotating new products monthly: how to manage specs and HACCP
How do you manage your food safety management system?
HARA Manufacturing Process Steps
ISO 22002 2025 Change Summary - Food Manufacturing
Traceability Requirements for SALSA Audits
Job Satisfaction in Food Manufacturing – Is Anyone Enjoying Their Role?
Best Practice for Bulk Silo Traceability
Co-Manufacturing with Kosher Supervision – Hazard Analysis
Implementing Lot Traceability in Small-Scale Production
Kleenex Use on the Manufacturing Floor