7.2.2 Infrastructure and maintenance PRPs

Started by , Jan 24 2011 08:40 AM
3 Replies

The organization shall establish and maintain the infrastructure needed to achieve conformity to the food safety needs including as applicable

a) lay-out, design and construction of buildings and facilities, including workspace, employee facilities, and associated utilities,
b) supplies of air, water, energy and other utilities,
c) equipment including its preventative maintenance, sanitary design and accessibility for maintenance and cleaning for each unit, and
d) supporting services including waste and sewage disposal.

Verification of the fulfilment of these requirements shall be planned (see 7.8). The infrastructure shall be modified as necessary, taking into account the results of the hazard analysis (7.4) and the capability of the selected control measures to control the identified food safety hazards (see 7.5 and 7.6). Such modifications shall be recorded.



Can somebody help please to explain in brief and simple way and there meaning here of requirements with practical idea or example.

Thank you.

Share this Topic
Topics you might be interested in
Is it possible to have no OPRP if we can control through PRPs? Maintenance Shop Refrigerator Water hoses and nozzles - maintenance and cleaning schedule What kind of Verification is required for Maintenance and Sanitation? GMP rules for maintenance
[Ad]
Dear 22000,

This requirements indicates that you should identify which infrastructure you need and that you should maintain this infrastructure in good condition.e.g. by preventive maintenance program. Infrastructure is more then only the eqipment, but also includes for example buildings, site area, facilites, water , air, software and supporting services.

You need to verify ifthe infrastructure is maintained. E.g. by inspections, internal audits, verification of records. If these verification shows need for modification you should implement this modification (could be investment) and document it.
Dear 22000

It's good idea to put all applicable utilities on the paper e.g.layout drawings, showing the allocation of workspace, employee facilities, equipment, flow of air, water, energy, waste etc.

-



Can somebody help please to explain in brief and simple way and there meaning here of requirements with practical idea or example.

Thank you.


Dear 22000

It's good idea to put all applicable utilities on the paper e.g.layout drawings, showing the allocation of workspace, employee facilities, equipment, flow of air, water, energy, waste etc.

-

Will anyone have said drawing as example?
That would be great. clap:

Similar Discussion Topics
Is it possible to have no OPRP if we can control through PRPs? Maintenance Shop Refrigerator Water hoses and nozzles - maintenance and cleaning schedule What kind of Verification is required for Maintenance and Sanitation? GMP rules for maintenance Maintenance team footwear in production areas of a low risk poultry processing plant Preventative Maintenance Program How to handle the following FDA observation: Your plant was not constructed to facilitate maintenance and sanitary operations Is a line clearance form for all maintenance work required? KPI Maintenance Form