Version 5 stated that we had to work against standard ISO 17025 - this is no longer mentioned. Does this mean that we no longer have to do this? Eg. I can shorten our labmanual so only things not mentioned in our BRC-manual is mentioned in there. And, offcourse, based on riskassesment we may do confirmation of Coli Vtec?
Shelf-Life Testing
Testing Results
Micro Testing Limits for Hemp Seeds and Oils
Annual Product Testing
Compressed Air Testing: Is Annual Microbiological Analysis Necessary or Can the Requirement Be Removed?
[Ad]
For Issue 6 they have enlarged the whole Product Testing section, and Laboratory Testing is within 5.5.2.
Specifically 5.5.2.3 still requires that for analyses critical to product safety or legality, the laboratory shall be either be accredited to or work in accordance with the requirements of ISO17025.
Specifically 5.5.2.3 still requires that for analyses critical to product safety or legality, the laboratory shall be either be accredited to or work in accordance with the requirements of ISO17025.
1 Thank
Version 5 stated that we had to work against standard ISO 17025 - this is no longer mentioned. Does this mean that we no longer have to do this? Eg. I can shorten our labmanual so only things not mentioned in our BRC-manual is mentioned in there. And, offcourse, based on riskassesment we may do confirmation of Coli Vtec?
Still a requirement in version 6 as far as I can see! Pathogen testing is covered under 5.5.2.1 so you'd have to have full segregation i.e. separate buildings normally, separate drains etc.
1 Thank
Thanks both of you - obviously I have "forgotten" this chapter
We will send the samples to external lab as we do now
We will send the samples to external lab as we do now
Shelf-Life Testing
Testing Results
Micro Testing Limits for Hemp Seeds and Oils
Annual Product Testing
Compressed Air Testing: Is Annual Microbiological Analysis Necessary or Can the Requirement Be Removed?
Looking for Water Testing Recommendations
Metal Detector Testing When Used Only as X-Ray Backup
FSSC 22000 Scheme Version 7 expected to be published March/April 2026
Shelf life testing of baked goods
Cooling Tank Water Testing