Production Zone Demarcation Confusion
Started by TEJUSAN, Oct 25 2012 04:24 PM
Good day all,
I am really confused with some BRC Issue 6 requirements. Ours is a Nile Perch Processing establishment. According to BRC Issue 6, all of the sections to be marked as low risk areas. There comes the real problem as the BRC auditors want us to put labels at the entrance of the each section showing that it is a low risk area., but how is it possible to put labels considering only the BRC standards where as we have to take in to account some other regulatory authorities like the Department of Fisheries of the country, European Union etc. To them the trimming section, packing section etc are high risk areas. I expect some good thoughts regarding the same.
Thanks and regards,
SANS
I am really confused with some BRC Issue 6 requirements. Ours is a Nile Perch Processing establishment. According to BRC Issue 6, all of the sections to be marked as low risk areas. There comes the real problem as the BRC auditors want us to put labels at the entrance of the each section showing that it is a low risk area., but how is it possible to put labels considering only the BRC standards where as we have to take in to account some other regulatory authorities like the Department of Fisheries of the country, European Union etc. To them the trimming section, packing section etc are high risk areas. I expect some good thoughts regarding the same.
Thanks and regards,
SANS
Enforcing a policy of no ear buds and talking on the phone in the production room
Risk Zoning for Tempeh Production: Low-Risk or High-Risk Under BRCGS?
Cross-Contamination Risk in Multi-Category Food Production
Assessment for Production Risk Zones based on Clause 4.3.1 of BRC Issue 9
Implementing Lot Traceability in Small-Scale Production
[Ad]
4.3.1 says you need a site plan showing this sort of thing and identifying 4 different types of risk / care areas as appropriate. Depending on the type of area, they may then need to be segregated and you show movement of materials, people etc on the diagrams with defined routes. Unless I am missing something I do not know where it says you have to put labels at the entrance to areas...?
Enforcing a policy of no ear buds and talking on the phone in the production room
Risk Zoning for Tempeh Production: Low-Risk or High-Risk Under BRCGS?
Cross-Contamination Risk in Multi-Category Food Production
Assessment for Production Risk Zones based on Clause 4.3.1 of BRC Issue 9
Implementing Lot Traceability in Small-Scale Production
Production Room Layout Query: Accessing Cold Room via Changing Area
Correct sequence for putting on clean attire before entering a production room
Technical Guidance for Factory-Scale Tempeh Production Under BRCGS
Controlling Mycotoxins in Production
Best Cutting Tools for Solid Frozen Food Blocks in Production