Our on-site laboratory is based within the factory. All of the equipment with the laboratory is on our risk assessed glass register and is audited accordingly.
However, we have some glass consumables (curvettes) , which i keep in my office, and issue out to production, as and when needed, and they return to me for disposal in a sharp's box.
I currently have a log where i document the date, time issued, issued to, number issued and number returned , condition , with relevant signatures. But i have a feeling that i may be missing something. I have done a (separate from my pre-requisite) risk assessment which is loosely based on the risk assessment i have for temporary engineering works, (what are the hazards, who could be harmed etc).
i'd welcome any comments from others who are in a similar position as to how their plant manages such consumables in a production area.
Caz x
However, we have some glass consumables (curvettes) , which i keep in my office, and issue out to production, as and when needed, and they return to me for disposal in a sharp's box.
I currently have a log where i document the date, time issued, issued to, number issued and number returned , condition , with relevant signatures. But i have a feeling that i may be missing something. I have done a (separate from my pre-requisite) risk assessment which is loosely based on the risk assessment i have for temporary engineering works, (what are the hazards, who could be harmed etc).
i'd welcome any comments from others who are in a similar position as to how their plant manages such consumables in a production area.
Caz x
Pest control portal navigation- ecolab
Allergen Control in Wholesale
How to Control Knives and Cutting Instruments Under SQF
What to Include in a Master Label Control Log
Alternatives to Strip Curtains for Pest Control
[Ad]
Sounds like a solid checkout log. Only thing I think might be missing is where do you document the investigation/check if one goes missing or gets broken on the production floor?
Maybe you should consider doing away with glass control log if you can switch from glass to non brittle plastics?
Pest control portal navigation- ecolab
Allergen Control in Wholesale
How to Control Knives and Cutting Instruments Under SQF
What to Include in a Master Label Control Log
Alternatives to Strip Curtains for Pest Control
Does anyone have a procedure for pest control?
Using pH as a Critical Control Point (CCP) for Listeria Control
Glass Auditing - Pointless Exercise or Critical Control
Best Practices for Pet Food Changeover Matrices and Allergen Control
CCP and Preventive Control in the same Hazard Analysis