Dear All,

Could any one of you  give more clarification on this clause.

 

" 7.5.2 Validation of processes for production and service provision "

 

 What are the special processes???

 

Valuable comments highly appreciated.

 

Thanking u all in advance.

 

Anie

Share this Topic
Topics you might be interested in
Allergen Management do i need a risk assesment or allergen validation for a facility that produces allergen based foods only like nuts? Production Room Layout Query: Accessing Cold Room via Changing Area Switching Between Tree Nuts: Is New Allergen Validation Needed? Correct sequence for putting on clean attire before entering a production room Technical Guidance for Factory-Scale Tempeh Production Under BRCGS
[Ad]

Dear All,

Could any one of you  give more clarification on this clause.

 

" 7.5.2 Validation of processes for production and service provision "

 

 What are the special processes???

 

Valuable comments highly appreciated.

 

Thanking u all in advance.

 

Anie

 

7.5.2 where ?

 

Rgds / Charles.C

Hi Charles,

 

In ISO 9001: 2008 standard 

 

Thxs

Anie

Dear Anie,

It is not about the special processes. It is about your processes. You need to show that the arrangements you have put in place are achieving the end results you have decided.

Thanks

Gourav

Validation is 'proving' via objective evidence, tests results, experiments and other scientific methods that your processes are capable of doing what you say they are doing. If you have specific processes you are seeking clarification on we may be able to help more.

 

George

I also have doubts about 7.5.2. clause. It talks about validation when verification is not possible.  Does anyone have examples of processes you validated?

I also have doubts about 7.5.2. clause. It talks about validation when verification is not possible.  Does anyone have examples of processes you validated?

I found an example for this clause, not in food industry but in asphalt industry where my friends work for.

 

They made asphalt with packaging using a 200 L drum.

In their experience, it's difficult to weigh the drum since the product is very hot (approx 150 degrees celcius) after filling and also the weigh of the drum can be vary.

So they choose to use a stick with dedicated sign for the height of the product in the drum (200 L ~ 78,5 cm for filling temperature).

The stick is also checked regularly with a calibrated equipment to ensure the sign is correct

 

This process is included in clause 7.5.2

 

I hope this helps.

Rgds

Hadi

MD burger is an another example. The tastes is determined only after it is cooked. But as we aware MD burger tastes same elsewhere. 7.5.2 clause apply to this process. Your thougts

Sent from my HP Slate 7 Voice Tab using Tapatalk

Your thougts

Hi prady,

 

I prefer to taste.


Similar Discussion Topics
Allergen Management do i need a risk assesment or allergen validation for a facility that produces allergen based foods only like nuts? Production Room Layout Query: Accessing Cold Room via Changing Area Switching Between Tree Nuts: Is New Allergen Validation Needed? Correct sequence for putting on clean attire before entering a production room Technical Guidance for Factory-Scale Tempeh Production Under BRCGS Allergen risk assessment and validation for allergen transfer to uniforms Controlling Mycotoxins in Production Shelf life validation for the fermented batter Best Cutting Tools for Solid Frozen Food Blocks in Production Defining CCPs vs. Preventive Controls in Non-Alcoholic Beverage Production