What's New Unreplied Topics Membership About Us Contact Us Privacy Policy
[Ad]

Risk Assessment, Lunchroom>Process room

Started by , Jun 20 2014 01:10 PM
2 Replies

Good Day;

 

In the process of changing a current lunchroom to a process room.   What would be the best way to document the changes, additions of equipment, structure and control of risks. 

 

 

Thanks

Share this Topic
Topics you might be interested in
Risk analysis hair covering requirement as per BRCGS issue 7 Are argentine peanuts a food safety risk ? Patulin risk assessment Risk assessment : Biphenyl in food Allergen risk assessment and validation for allergen transfer to uniforms
[Ad]

I have a form called a change management form. Its more geared towards production changes, but I've posted it here so that you can do what you want to with!

 

Caz x

Attached Files

3 Thanks

Hi Caz,

 

Nice analysis. Important RA IMO but typically totally ignored by Top Mngt. until it's too late.

 

Rgds / Charles.C


Similar Discussion Topics
Risk analysis hair covering requirement as per BRCGS issue 7 Are argentine peanuts a food safety risk ? Patulin risk assessment Risk assessment : Biphenyl in food Allergen risk assessment and validation for allergen transfer to uniforms Packaging Area Zoning - High Care vs Low Risk SQF Finding 11.5.5.2 - CO2 Micro Testing Requirement for Low-Risk Bakery Is food safety part of your risk register? Can Frozen Dairy Dessert Be Classified as Low Risk Under BRC? Assessment for Production Risk Zones based on Clause 4.3.1 of BRC Issue 9