What is a Verification Schedule?

Started by , Mar 05 2015 07:27 PM
4 Replies

After searching this site for endless hours, I kept getting conflicting information about a verification schedule. Some say your Internal Audit Schedule would suffice and other say no. Which is correct? Do I need to have a separate schedule showing the process I verify, or simply showing our auditor my internal audit schedule would work........

 

Thanks in Advance

 

Loni

Share this Topic
Topics you might be interested in
Allergen validation and verification as per FSSC Version 6.0 Water hoses and nozzles - maintenance and cleaning schedule Verification & Validation - scheduling, methods, etc. What kind of Verification is required for Maintenance and Sanitation? Validation and Verification: Ensuring Compliance and Excellence
[Ad]

2.5.3 is your verification schedule,  I use this for verification activities - Verify the metal detector is working every 30 minutes .  Verify chemical concentration every morning via titration.

  

Internal audits go on 4.5.2 (Validation schedule)

 

To make it easier, I combine the 2.5.3 form with 2.5.1 (methods and responsibilities) and 2.5.4 (Verification of monitoring activities) .   Basically it's a chart with each monitoring and verification activity, frequency, and responsibility.

So maybe the QA Manager checks the visitor log once a week, but they only conduct a food defense audit annually.  The check goes on verification of monitoring, the audit goes on validation.

 

It can get very "fuzzy" as SQF does not dictate which activity is which. I attached copies of both if it will help - but don't be surprised if you get some different answers.

 

4 Likes

Thank you this helps ALOT! :biggrin:

After searching this site for endless hours, I kept getting conflicting information about a verification schedule. Some say your Internal Audit Schedule would suffice and other say no. Which is correct? Do I need to have a separate schedule showing the process I verify, or simply showing our auditor my internal audit schedule would work........

 

Thanks in Advance

 

Loni

 

Dear Loni Banaszak,

 

The basic problem as indicated in previous post is that SQF seem to have difficulty in deciding within themselves as to the preferred options regarding the interpretation of some fundamental activities. I suspect they wish to conform but also to be innovative. A difficult combination to validate. :smile:

 

IMO their (first)  Auditorial Directive should be "Make the Glossary Fit The Standard" (apologies to G&S)

 

Rgds / Charles.C

 

PS - From memory, ISO22000 defines the Internal Audit process as part of the System Verification Procedure. Such simplicity. Nudge-nudge SQF.

Thank you Charles!


Similar Discussion Topics
Allergen validation and verification as per FSSC Version 6.0 Water hoses and nozzles - maintenance and cleaning schedule Verification & Validation - scheduling, methods, etc. What kind of Verification is required for Maintenance and Sanitation? Validation and Verification: Ensuring Compliance and Excellence Validation and Verification: Ensuring Compliance and Excellence Validation and Verification: Ensuring Compliance and Excellence PRP Verification Activities X-ray monitoring and verification Metal Detector Frequency and Verification