Section 3.7 - Management of Subcontracted Processes

Started by , Jan 19 2016 07:02 PM
3 Replies

Hello Guys,

 

With the revision of the standard, it is pretty clear to us that our artwork is considered subcontracted to a 3rd party. Now I don't have a clue on what documents am I going to require to our subcontractor. If anyone has idea about, I need your help.

 

Thanks in advance!

 

 

Share this Topic
Topics you might be interested in
BRCGS Section 4.6 risk assessments for version 9 Section 11.7.5.7 - Knife Control of Box Cutters Does primary conversion section 5.9 of BRCGS Version 9 apply to lobsters? BRC Section 4.5.3 Air BRCGS Section 5.9 - Animal Primary Conversion
[Ad]
Hi Lorenab I suppose you are referring section 3.5.3.1 The requirements in managing the service provider are 1. You should have a documented procedure for approval of suppliers 2. There should be written contract with service provider which clearly explained standard of service and the client/customer requirements. 3. You may also need copies of their quality certification Kind regards Dr. Humaid Khan MD - Halal International Services
1 Thank

Hi Lorenab,

 

I think the previous poster is quoting issue 4 of the standard.

 

The relevant section of the BRC Global Standard for Packaging and Packaging Materials Issue 5 July 2015 is:

3.7 MANAGEMENT OF SUBCONTRACTED PROCESSES
Where any process steps in the manufacture of the packaging material are subcontracted to a third party or undertaken at another site, this shall be managed to ensure it does not compromise the quality, safety or legality of the product.
CLAUSE REQUIREMENTS
3.7.1 The use of subcontractors and the status of the subcontractor with respect to the Standard shall be notified to the brand owner and/or customer.
3.7.2 Where any processes are subcontracted, including artwork or pre-press activity, the risks to the quality and safety of the product shall form part of the hazard and risk analysis and the company’s evaluation of the system shall be held on record.
3.7.3 Clear specifications shall be agreed for all work outsourced to a subcontractor.
3.7.4 Where any process steps in the manufacture of the packaging or packaging material are subcontracted, final release of the product shall remain the responsibility of the site.
Controls shall be in place for checks on finished work to ensure product safety and quality meets specification prior to dispatch to the final customer.

 

So you should have supplier approval documentation, your hazard analysis should include this contracted work and appropriate controls applied. There should be agreed specifications, checks on the finished work and evidence of final release by yourselves. You also need to consider how you meet the requirements of 5.2 GRAPHIC DESIGN AND ARTWORK CONTROL.

 

Regards,

 

Tony

 

 

1 Like2 Thanks

Hi Lorenab,

 

I think the previous poster is quoting issue 4 of the standard.

 

The relevant section of the BRC Global Standard for Packaging and Packaging Materials Issue 5 July 2015 is:

3.7 MANAGEMENT OF SUBCONTRACTED PROCESSES
Where any process steps in the manufacture of the packaging material are subcontracted to a third party or undertaken at another site, this shall be managed to ensure it does not compromise the quality, safety or legality of the product.
CLAUSE REQUIREMENTS
3.7.1 The use of subcontractors and the status of the subcontractor with respect to the Standard shall be notified to the brand owner and/or customer.
3.7.2 Where any processes are subcontracted, including artwork or pre-press activity, the risks to the quality and safety of the product shall form part of the hazard and risk analysis and the company’s evaluation of the system shall be held on record.
3.7.3 Clear specifications shall be agreed for all work outsourced to a subcontractor.
3.7.4 Where any process steps in the manufacture of the packaging or packaging material are subcontracted, final release of the product shall remain the responsibility of the site.
Controls shall be in place for checks on finished work to ensure product safety and quality meets specification prior to dispatch to the final customer.

 

So you should have supplier approval documentation, your hazard analysis should include this contracted work and appropriate controls applied. There should be agreed specifications, checks on the finished work and evidence of final release by yourselves. You also need to consider how you meet the requirements of 5.2 GRAPHIC DESIGN AND ARTWORK CONTROL.

 

Regards,

 

Tony

 

 

Hi Tony,

 

Thank you so much for your clarification.

 

Regards,

Lorena


Similar Discussion Topics
BRCGS Section 4.6 risk assessments for version 9 Section 11.7.5.7 - Knife Control of Box Cutters Does primary conversion section 5.9 of BRCGS Version 9 apply to lobsters? BRC Section 4.5.3 Air BRCGS Section 5.9 - Animal Primary Conversion BRCSGS section 1.1.2 Food Safety Culture TS 22002-1 Section 8 Equipment suitability, cleaning and maintenance How are companies approaching Section 2.3.2 (Specifications) in SQF Code 9.0 S&D V4 Section 5.2.7 Waste Containers not in compliance with section 54 of the SFCR