How to achieve sanitary design in old equipment?

Started by , Jun 01 2016 12:56 AM
2 Replies
I am doing freelance work ( consulting) and the place I am at has 4 large bucket elevator, scales etc. Equipment is aged. Equipment is now full of holes either from them making new holes and where some nuts and bolts used to be and they figured they don't need them. Is there any suggestions on how I can close these holes ? ? It's mainly stainless steel and plexi . Maybe rivets? Maybe replace the nuts and bolts ( in some areas the reason they bore new holes was loss of threading in one area) Please assist?.
Share this Topic
Topics you might be interested in
Exploring How Proper Equipment Passivation Relates to Biofilm Prevention in the Context of Rust Innovative equipment and devices for food safety and quality Evaluating CIP and Sanitation Chemicals for Fruit Drink Processing Equipment How to Get a Sanitary Transport Compliance Letter for Flour Shipments Finding a New Supplier for Product-Contact CO2 Testing Equipment?
[Ad]

Personally, if it is just stainless steel I 'd have them dab some weld in the holes and grind them flush. If excessively large holes or a number of holes in close proximity, weld a plate over the top. A good weld will have decent surface easy to keep clean. 

For the Plexi, if it's sheet plexi, it'd only cost a few dollars to replace.

I am doing freelance work ( consulting) and the place I am at has 4 large bucket elevator, scales etc. Equipment is aged. Equipment is now full of holes either from them making new holes and where some nuts and bolts used to be and they figured they don't need them. Is there any suggestions on how I can close these holes ? ? It's mainly stainless steel and plexi . Maybe rivets? Maybe replace the nuts and bolts ( in some areas the reason they bore new holes was loss of threading in one area) Please assist?.

This is what I would do.

 

For the stainless steel, have a certified/professional welder or metal fabricator build up metal in the holes while making sure that they have a completed area that is smooth and has no places for food to collect.  I say to use a certified welder because stainless steel comes in several alloys, and the rod/settings used will be different for each.  Plus, if they melt holes in the metal, you should be able to hold them responsible.  Welding stainless is not cheap and is tricky, but if not done correctly, it will not be a sanitary surface.

 

For the Plexiglas, it's harder.  I don't think you can "fill" holes in that, and it's hard to re-create that smooth surface once it's been cut.  It may be cheaper to just replace the entire piece rather than try to get someone to fill holes correctly.  I'd talk to a local company that fabricates Plexiglas.

 

Martha


Similar Discussion Topics
Exploring How Proper Equipment Passivation Relates to Biofilm Prevention in the Context of Rust Innovative equipment and devices for food safety and quality Evaluating CIP and Sanitation Chemicals for Fruit Drink Processing Equipment How to Get a Sanitary Transport Compliance Letter for Flour Shipments Finding a New Supplier for Product-Contact CO2 Testing Equipment? Sharing Equipment Between Different Areas of Production Facility Limited equipment spacing around floor drain Commission Equipment Checklist New Equipment Risk Assessments How can we address potential non-compliance for infrequent equipment cleaning?