What's New Unreplied Topics Membership About Us Contact Us Privacy Policy
[Ad]

FSSC 22000 Manual

Started by , Mar 22 2017 11:48 AM
2 Replies

Hi we have decided to go for FSCC 22000 from ISO 22000. Already i have ISO 22000:2005 manual for Food Safety Management System. Shall i write PRP manual based on ISO/TS 22002-1:2009 standard like i wrote for ISO 22000:2005?

Or

ISO 22000:2005 manual is enough and don't need to write a manual for PRP?

Share this Topic
Topics you might be interested in
FSSC 22000 Scheme Version 7 expected to be published March/April 2026 Question 4 in Decision Tree of FSSC 22000 FSSC Supplier Questionnaires FSSC contradiciton from HACCP Allergens as a hazard in ISO 22000 and FSSC 22000—must they be OPRP-CCP?
[Ad]

Hi we have decided to go for FSCC 22000 from ISO 22000. Already i have ISO 22000:2005 manual for Food Safety Management System. Shall i write PRP manual based on ISO/TS 22002-1:2009 standard like i wrote for ISO 22000:2005?

Or

ISO 22000:2005 manual is enough and don't need to write a manual for PRP?

 

Hi Santhosh,

 

It depends on whether what you have already written fully complies with iso22002-1 (it likely doesn't). Afaik, the basic format is up to you.

You will need to consider the prequisite requirements that are not covered in your current manual. Technical Specification ISO 22002 specifies detailed requirements to be specifically considered in relation to ISO 22000:2005, 7.2.3: In addition, it adds other aspects which are considered relevant to manufacturing operations:
1) rework;
2) product recall procedures;
3) warehousing;
4) product information and consumer awareness;
5) food defence, biovigilance and bioterrorism.

 

I have posted previously on FSSC 22000 certification requirements, you can see a summary here, note that there are addition FSSC requirements as well as complying with ISO 22002.

 

Kind regards,

 

Tony


Similar Discussion Topics
FSSC 22000 Scheme Version 7 expected to be published March/April 2026 Question 4 in Decision Tree of FSSC 22000 FSSC Supplier Questionnaires FSSC contradiciton from HACCP Allergens as a hazard in ISO 22000 and FSSC 22000—must they be OPRP-CCP? FSSC 22000 v6 – Must Suppliers Be Certified? Impact of ISO 22002-100:2025 on FSSC V6 Documentation Requirements Can anybody share an FSSC Internal Audit Checklist? Requesting Educational Materials on FSSC 22000 Certification FSSC V6 Internal audit Checklist