What's New Unreplied Topics Membership About Us Contact Us Privacy Policy
[Ad]

A documented program addressing all metals that may pose a risk

Started by , Jan 09 2018 03:06 PM
2 Replies

Good Day, my name is Mbulelo working for the snack industry. I need to draft a program addressing all metals that may pose a risk of physical contamination. Anyone who has done this before with a template on how this program should look like??

Share this Topic
Topics you might be interested in
Risk assessment for equipment calibration Risk assesment for nut allergen to remove it from the system Supplier Risk Assessment Environmental Monitoring Program Concerns at USDA-Regulated Meat Facility HARA same as risk assessment for ISO?
[Ad]

Not sure I am upstanding you. The way we handled it was to do a risk assessment specific to physical hazards and the control measures needed. This resulted in the identification of wood, glass, brittle plastic , hard plastic and metal. Wood was condensed into " essential" vs non essential wood, a glass and brittle plastic register was created and metal detection was identified as the control measure needed to address metal and tramp metal, where tramp metal is the junk introduced with ingredietns including  stones with a ferrous signature.( e.g Raisins) 

Non essential wood was eliminated

Essential wood was treated as a PRP

Glass and brittle plastic was also a PRP 

Metal was a CCP

Good Day, my name is Mbulelo working for the snack industry. I need to draft a program addressing all metals that may pose a risk of physical contamination. Anyone who has done this before with a template on how this program should look like??

 

Hi Mbulelo,

 

You omitted to mention wheter any specific FS Standard involved. Maybe relevant.

 

Generically, it's basically simple.

 

As you imply in yr OP, you need to do a Risk Assessment based on evaluating your Process/Environment with respect to any metals which you consider may pose a significant risk of  contaminating the product.

 

eg -

 

Fe - Stainless steel conveyor belts.

Fe - Ferrous Iron due Iron Tables.

etc


Similar Discussion Topics
Risk assessment for equipment calibration Risk assesment for nut allergen to remove it from the system Supplier Risk Assessment Environmental Monitoring Program Concerns at USDA-Regulated Meat Facility HARA same as risk assessment for ISO? Looking for Management of Change Procedure and Risk Template Is Raw Milk Safe for Consumption? Risk, Regulations & Recalls How to Include Adverse Events in Your Environmental Monitoring Program (EMP) Assessment for Production Risk Zones based on Clause 4.3.1 of BRC Issue 9 Lessons from the Martinelli Case: Importance of Supplier Risk Controls