What's New Unreplied Topics Membership About Us Contact Us Privacy Policy
[Ad]

Scope of validation and verification procedures

Started by , Sep 15 2018 06:09 AM
3 Replies

Hello Dears , 

I have an inquiry about Validation and verification ,is the whole plant should have a general Validation and verification procedure ? and this procedure to be included in everything or each department should have their own one like food safety especially should have their own procedures. 

If you please have any material could support me and solve this issue please share. 

Kind Regards

Mohamed 

Share this Topic
Topics you might be interested in
What Happens When You Remove Product Lines from Your BRC Scope? GRMA Audit for Dietary Supplements – Scope, Experience, and Differences from NSF Lab Accreditation Issues – Can a Lab Perform Tests Outside Its ISO Scope? Examples Needed for Manufacturing Audit Scope Outsourced Distribution Scope for FSSC 22000 Certification
[Ad]
Mohamed,

The short answer is yes. There should be validation and verification in every system element for your company. That is to say that an example would be that you should have a process in place that ensures that your pest control plan is in place and that someone is checking it and then you should make sure that the plan is effective. The idea here is to answer two questions, 1) Validation answers - what is the plan in place 2) Verification answers - is it getting the desired results. Hope this helps.

Cheers!
1 Thank

Mohamed,

The short answer is yes. There should be validation and verification in every system element for your company. That is to say that an example would be that you should have a process in place that ensures that your pest control plan is in place and that someone is checking it and then you should make sure that the plan is effective. The idea here is to answer two questions, 1) Validation answers - what is the plan in place 2) Verification answers - is it getting the desired results. Hope this helps.

Cheers!

Thanks Brendan for your help :) 

Happy to help Mohamed!

Similar Discussion Topics
What Happens When You Remove Product Lines from Your BRC Scope? GRMA Audit for Dietary Supplements – Scope, Experience, and Differences from NSF Lab Accreditation Issues – Can a Lab Perform Tests Outside Its ISO Scope? Examples Needed for Manufacturing Audit Scope Outsourced Distribution Scope for FSSC 22000 Certification What could be the root cause for a non-conformance related to scope determination and documentation in an ISO 22000 Stage 1 audit? How should glass and brittle plastics be managed in trucks and hysters that enter and exit scope areas? Do we include third party manufacturing products in our FSSC 22000 scope? Does a change in managing product design drawings affect the audit scope for a manufacturing plant? How Does FSSC 22000 Address Trade Products in Its Certification Scope?