What's New Unreplied Topics Membership About Us Contact Us Privacy Policy
[Ad]

SQF Consultant charge by hour or job?

Started by , Dec 15 2018 07:34 PM
1 Reply

Hi everyone!!!

 

Does a Consultant charge by hour or by the job (to developed a SQF Food Safety Plan???

And

How much does a consultant charge???

 

Thanks again.

Share this Topic
Topics you might be interested in
As A Food Safety Consultant - Do You Develop Food Safety Systems Alone ? Fair Price to charge for developing 2 HACCP plans Pasteurized Milk Ordinance - 72 hour storage tank rule Advice about employing a BRC Consultant For temperature cooling does the time limit of 2-hour start when the temperature is at 135 °F for the sauce?
[Ad]

I know of some consultants that charge by the hour, however we don't.

 

For short GAPs (for instance) we charge by the day and base the length on past experiences, etc - normally it works out to 2.5 days.

 

For SQF developments we charge by the project and there are just way too many variables to indicate a price.

 

For instance the one we have coming up is an off-site development with 3 weeks at the end on-site to assist on starting up implementation and handling some of the training and then we just completed another one that was 30 days on-site and that company has opted for our eConsultant program so we will assist them with remotely during implementation.

 

Best way to find out is to call one and discuss your exact needs, dates, etc.


Similar Discussion Topics
As A Food Safety Consultant - Do You Develop Food Safety Systems Alone ? Fair Price to charge for developing 2 HACCP plans Pasteurized Milk Ordinance - 72 hour storage tank rule Advice about employing a BRC Consultant For temperature cooling does the time limit of 2-hour start when the temperature is at 135 °F for the sauce? How much should I charge for creating a whole food safety program and get the production facility certified with GMP audit In your facility who is in charge of machinery painting? Environmental monitoring program corrective actions 24 hour operations What is your Food Safety Consultant Charging? What is the best method to charge by hour or by project?