Hello,

 

I'm reviewing our filters/magnets program for a facility that has had filters and magnets added as knee-jerk reactions to foreign material events over the last several years. Does anyone have good general reference material for where PPP should be located in a line? I know to review customer complaints and foreign material findings to determine where PPP are needed in our specific facility but I'm also looking for some kind of industry or academic reference of effective placement of PPP. Examples would be before main pumps, at delivery of bulk goods, at finished packaging, etc.

 

Thank you for your help if you have a good reference to share.  ;)

Share this Topic
Topics you might be interested in
When is Reworking of product acceptable New Product Development New Product Development Fresh Product Supplier RASFF 2024 Overview: Top Product Groups and Hazards
[Ad]

Hmmmm. Not sure if there is any guidance on where you must install magnets and filters.  It would be more of a determination once you complete your hazard analysis and identification of potential hazards.  GFSI schemes do not make direct mention of locations either.  One source that may help is the AIB consolidated Standards for Inspection where they do identify some requirements.

Hello,

 

I'm reviewing our filters/magnets program for a facility that has had filters and magnets added as knee-jerk reactions to foreign material events over the last several years. Does anyone have good general reference material for where PPP should be located in a line? I know to review customer complaints and foreign material findings to determine where PPP are needed in our specific facility but I'm also looking for some kind of industry or academic reference of effective placement of PPP. Examples would be before main pumps, at delivery of bulk goods, at finished packaging, etc.

 

Thank you for your help if you have a good reference to share.  ;)

 

I assume PPP = PRP.

 

There may be some confusion.

 

Generally PRPs are not  specifically related to the (functioning) Process Line.

 

That's why they are called PRPs.

 

Nonetheless implementation of  individual PRPs would obviously require a preliminary  risk assessment of the relevant parts of the overall system.


Similar Discussion Topics
When is Reworking of product acceptable New Product Development New Product Development Fresh Product Supplier RASFF 2024 Overview: Top Product Groups and Hazards No mock recall conducted with reworked product What Happens When You Remove Product Lines from Your BRC Scope? Supplier Approval System for Third-Party Manufacturers of Own Brand Product Private Label Product Shipping Without Full PDP – FDA Compliance? Are There AI Systems That Match Product to Label?