Is scheduling a future date for an Internal Audit of a program an acceptable response for an NC?

Started by , Mar 19 2020 08:41 AM
3 Replies

Is scheduling a future date for an Internal Audit of a program an acceptable response for a NC? We have a NC for 3.11.2 for not having conducted a test on our Recall and Withdrawal system.  Our staff is out, partly due to slow season and partly due to recent state of emergency requirements due to the coronavirus.  I have scheduled this for future review (April 2020). I am including an audit schedule in my response.  Do you feel this will be acceptable or will I need to conduct the review now?

 

Many Thanks!

Share this Topic
Topics you might be interested in
How to Include Adverse Events in Your Environmental Monitoring Program (EMP) GFSI audit grumbles FSSC V6 Internal audit Checklist First SQF Audit Experience: Is This Normal? SQF Internal Audit Documentation question
[Ad]

I don't think the response is unreasonable given the circumstances, but to an extent you'll be at the mercy of the auditor's sense of pragmatism - there would be a legitimate argument that if an actual emergency arose then you would need to be able to run the recall system now/today/immediately.

Is scheduling a future date for an Internal Audit of a program an acceptable response for a NC? We have a NC for 3.11.2 for not having conducted a test on our Recall and Withdrawal system.  Our staff is out, partly due to slow season and partly due to recent state of emergency requirements due to the coronavirus.  I have scheduled this for future review (April 2020). I am including an audit schedule in my response.  Do you feel this will be acceptable or will I need to conduct the review now?

 

Many Thanks!

 

I understand the circumstances, however as a former SQF Auditor I doubt a future date will not be acceptable to the Auditor or reviewer.

I suggest conducting the review now and sending in your successful test documentation now.

Thank you so much for your advice, much appreciated.  I will conduct the review


Similar Discussion Topics
How to Include Adverse Events in Your Environmental Monitoring Program (EMP) GFSI audit grumbles FSSC V6 Internal audit Checklist First SQF Audit Experience: Is This Normal? SQF Internal Audit Documentation question SQF surprise audit - how to plan with staff and vacation requests Acceptable EB Levels on Food Contact Surfaces? Customer Audit Eligibility: Minimum Requirements & Best Practices Importance on Internal Audits in Ensuring Food Safety Importance on Internal Audits in Ensuring Food Safety