BRC Guidelines in Understanding Requirements for new site

Started by , Jun 16 2021 01:26 AM
8 Replies

Hi, Has anyone has the BRC guidelines for new site, please? TIA

Share this Topic
Topics you might be interested in
FSSC 22000 Non-operating site Document Numbering System for Multi-Site Operations Understanding the BRCGS Skill Level Matrix vs Training Needs Identification Navigating SQF Certification for a New Site Customer Audit Eligibility: Minimum Requirements & Best Practices
[Ad]

Hi

 

Has anyone has the BRC guidelines for new site, please?

 

 

TIA

Hi Ives,

 

Yr query is unclear.

 

Please provide some context.

Apologies, BRC Certification Guidelines on building a new site. 

Apologies, BRC Certification Guidelines on building a new site. 

Hi Ives,

 

Helps to know Type/Status of Product, eg Frozen Raw Fish,  Canned Fruit, RTE, NRTE ?

 

Regardless 1st Step is to acquire and study the Standard.

 

Then do a Gap Analysis to determine if you have adequate Resources, eg Technical, for the FSMS System required.

 

Documents (2) for the above are freely available from BRC website

1 Thank

Thank you, Charles. I have these all covered.

 

 

Regards,

Thank you, Charles. I have these all covered.

 

 

Regards,

Assuming "covered" = "fully compliant" (Including any minimum time requirements for Production/Data accumulation), then I conclude you should be "audit-ready".

 

I recommend you invest in a trial BRC audit.

Hi Charles

 

Apologies, I have made it clear on our current situation. 

 

Our existing site is currently BRC Certified with AA Grade. We will be moving to a new, purpose-built manufacturing plant. I was keen to know if anyone has the Guidelines when moving to a new site.

Hi Charles

 

Apologies, I have made it clear on our current situation. 

 

Our existing site is currently BRC Certified with AA Grade. We will be moving to a new, purpose-built manufacturing plant. I was keen to know if anyone has the Guidelines when moving to a new site.

 

Hi Ives,

 

Sort of Post 4 again ?

 

It obviously critically relates to what you are doing.

 

Maybe you should consider BRC's Interp.Guidelines unless also already  "covered".

You would need to notify the certication body as it would change your scope.   Page 77/78 of the standard.  it woud most likely require a new audit. 

 

If you are looking for a checklist of how to build a BRC compliant facility, im not sure that exists other than the standard.   


Similar Discussion Topics
FSSC 22000 Non-operating site Document Numbering System for Multi-Site Operations Understanding the BRCGS Skill Level Matrix vs Training Needs Identification Navigating SQF Certification for a New Site Customer Audit Eligibility: Minimum Requirements & Best Practices Packaging Requirements for Cookie Dough Products SQF 11.1.2.3 - Clarifying Waste Trap Requirements SQF Trailer Inspection Requirements for UPS-FedEx Shipments Storage distance from wall requirements Meeting SQF 5.2.3 Requirements for In-House Labelled Fresh Produce