SQF (Primary Production) Ed.9, 10.6.1.1 Water Supply Plan

Started by , Aug 23 2021 03:54 PM
11 Replies

What have you done to comply with 10.6.1.1? Our site uses well water that we test annually against e.coli and coliforms. I am curious how others have implemented a water supply/contingency plan. Did you make a map to outline the map of the water system? What will you do in the event of water contamination in your potable water lines/sources? Thank you in advance.

Share this Topic
Topics you might be interested in
Neogen Supply Food safety culture plan fssc22000 v6 Standard Microbial Count for Equipment /Utensils in Food Industry (MEAT PRODUCTION AND VEGETABLES) No CCPs in a HACCP Plan - Can This Be Possible? Glove Dip Station filled with water and chlorine - is this normal?
[Ad]

What have you done to comply with 10.6.1.1? Our site uses well water that we test annually against e.coli and coliforms. I am curious how others have implemented a water supply/contingency plan. Did you make a map to outline the map of the water system? 

 

What will you do in the event of water contamination in your potable water lines/sources?

 

Thank you in advance.

 

^^^^(red) - Correct it ? (BCPAR???)

^^^^(red) - Correct it ? (BCPAR???)

 

Obviously any deviations must be corrected. Have you read 10.6.1.1? It states a contingency plan is required, writing 'correct it' will not suffice. Also, how are you outlining your flow of the water system? 

I would add

 

A) annual testing of well water is not sufficient. Period

 

B) you do need a plan     truck in water/co packer to take on your volume etc etc etc

A generic query is often associated with a generic answer.

The (self-evident ?) answer is an alternative supply.

We went through this exercise about 5 years ago when our owner directed us to determine contingency plans for water. Both of our facilities use a public water source. We started out by having a plan to bring water in by tanker trucks. This included (1) sourcing trucks that could hall the water, (2) sourcing potable water source, (3) having measures in place to actually unload the water, (4) sourcing temporary hand wash sinks. We had a listing of the items for 1 and 2 to reference in the event we needed to use the plan.

 

In the mean time, both facilities also worked to tie into a second public water source, which is now our contingency. In the event that one source has an issue we flip a switch (there is probably more to it then just a switch) to utilize the other source. This may be more on the extreme side and it absolutely helped that the owner was driving this, rather then food safety/sqf audit requirement. I keep records of water potability for both sources on file. 

1 Like1 Thank

Hi Juribe,

 

JFI my SQF Food ed 9 has this topic in section 11.5.1.2

 

Different Standard ?

Hi Juribe,

 

JFI my SQF Food ed 9 has this topic in section 11.5.1.2

 

Different Standard ?

 

Must be a different standard , we operate under 'Primary Plant Production' Module 10.

 

10.6.1.1 states:" A water supply plan shall be prepared that describes the water sources and the operational areas they serve and shall include the location of water sources, permanent fixtures, and the flow of the water system. The plan shall be kept current and revised when changes occur.

Contingency plans shall be in place for instances when the potable water supply is deemed to be contaminated or otherwise inappropriate for use."
 
This is a new standard for us for edition 9. I was looking for clarification on how to outline the flow of the water system. 

Only once a year you test?

 

We test every month.

 

We have a sealed alternate well that we can open up for emergency usage (once cleared by a local inspector at time of opening.)

 

Most of our clients with wells test quarterly, every two months a couple every month.

 

Must be a different standard , we operate under 'Primary Plant Production' Module 10.

 

10.6.1.1 states:" A water supply plan shall be prepared that describes the water sources and the operational areas they serve and shall include the location of water sources, permanent fixtures, and the flow of the water system. The plan shall be kept current and revised when changes occur.

Contingency plans shall be in place for instances when the potable water supply is deemed to be contaminated or otherwise inappropriate for use."
 
This is a new standard for us for edition 9. I was looking for clarification on how to outline the flow of the water system. 

 

 

No Problem. Afaik this forum was initially intended for Food Manufacturing but nothing available for Primary etc so  "A Stitch in Time ...."  :smile:

Only once a year you test?

 

We test every month.

 

We have a sealed alternate well that we can open up for emergency usage (once cleared by a local inspector at time of opening.)

 

Most of our clients with wells test quarterly, every two months a couple every month.

 

Yes, however we are a seasonal operation that only operates our processing facility for about 3-months out of the year. 

Once/year still isn't enough. If you test in the 1st month of production, how do you know it was okay for the rest?  At minimum you need to aim for beginning and end  (but once/month would be best)


Similar Discussion Topics
Neogen Supply Food safety culture plan fssc22000 v6 Standard Microbial Count for Equipment /Utensils in Food Industry (MEAT PRODUCTION AND VEGETABLES) No CCPs in a HACCP Plan - Can This Be Possible? Glove Dip Station filled with water and chlorine - is this normal? Food safety culture plan How to build a raw materials sampling plan? OPP Packaging leavening milky residue when in contact with water Shelf Life of Primary Packaging HACCP plan for chocolate and risk area decision tree