What's New Unreplied Topics Membership About Us Contact Us Privacy Policy
[Ad]

BRC-GS 4.16.6 scope

Started by , Oct 15 2021 08:08 AM
2 Replies

BRC-GS Fresh Produce states its scope "..The Standard ends at the point where the packed product leaves the site premises. The auditor will examine all procedures and
facilities throughout the whole process up to the dispatch of packed goods. The Standard does not cover storage and
distribution by third parties, as this is covered in the BRC Global Standard for Storage and Distribution." By this I understand, that we do not need ti cover third-party transportation-temperature controlled storing-transportation to customers with this standard.

 

In BRC-GS Food Safety I did not find any ending scope for the standard. Our packed cold products are transported by third-party to their temperature controlled cold rooms, and then transported from there to our clients. I wonder if we need to cover all processes until our products meet customers i.e. should we e.g. audit this third-party contractor for transportation and temperature control until the products meet customers? Or does the std scope end till third-party unpacks our products from their vehicles?

Share this Topic
Topics you might be interested in
What Happens When You Remove Product Lines from Your BRC Scope? GRMA Audit for Dietary Supplements – Scope, Experience, and Differences from NSF Lab Accreditation Issues – Can a Lab Perform Tests Outside Its ISO Scope? Examples Needed for Manufacturing Audit Scope Outsourced Distribution Scope for FSSC 22000 Certification
[Ad]

The scope of the certification only covers your own activities, so if you're not doing your own transport then it can't include this element.

You'd therefore be expected to assess and approve your transport provider(s) and any external storage companies you're using, to ensure that they're suitably competent, aren't doing anything that poses a risk to your products etc.

One other thing to determine is if you fund and arrange the shipping or if your customer does (stateside we call this CPU, or customer pick up). If BRC is anything like SQF, than the bulk of responsibility of assessing and approving the transport providers falls on the entity funding and arranging for them.


Similar Discussion Topics
What Happens When You Remove Product Lines from Your BRC Scope? GRMA Audit for Dietary Supplements – Scope, Experience, and Differences from NSF Lab Accreditation Issues – Can a Lab Perform Tests Outside Its ISO Scope? Examples Needed for Manufacturing Audit Scope Outsourced Distribution Scope for FSSC 22000 Certification What could be the root cause for a non-conformance related to scope determination and documentation in an ISO 22000 Stage 1 audit? How should glass and brittle plastics be managed in trucks and hysters that enter and exit scope areas? Do we include third party manufacturing products in our FSSC 22000 scope? Does a change in managing product design drawings affect the audit scope for a manufacturing plant? How Does FSSC 22000 Address Trade Products in Its Certification Scope?