FSSC 22000 v5.1 Additional Requirements - 2.5.13. Product Development

Started by , Jan 10 2023 05:41 AM
2 Replies

Hi Everyone: 

 

Can anyone explain what statement or requirements is needed to address the call-out that was raised during our stage 1 audit. 

a) Evaluation of impact of change on the FSMS taking into account new food safety hazards (incl. allergens) introduced and updating requirement to assess potential hazards introduced.

b) Consideration of the impact on the process flow for the new product and existing products and processes

 

 

Thank you so much. 

 

Share this Topic
Topics you might be interested in
Clarifying FSSC 22000 V6 Clause 2.5.5 on Positive Testing Trends Looking for Study Materials for FSSC 22000 Version 6 Lead Auditor Exam SQF vs FSSC 22000 – Key Differences and Document Numbering Tips How to Conduct an Environmental Risk Assessment under FSSC 22000 V6.0 FSSC 22000 Additional Requirements Version 6 Section 2.5.11
[Ad]

"In case of introducing new products & processed OR changing existing ones, the company shall evaluate new or potential food safety hazards (including allergens), and any related impacts on the FSMS (e.g. process flow change)"

"In case of introducing new products & processed OR changing existing ones, the company shall evaluate new or potential food safety hazards (including allergens), and any related impacts on the FSMS (e.g. process flow change)"

 

Do i have to make this statement stated on my prepared program? 

Please enlighten me. thank you 


Similar Discussion Topics
Clarifying FSSC 22000 V6 Clause 2.5.5 on Positive Testing Trends Looking for Study Materials for FSSC 22000 Version 6 Lead Auditor Exam SQF vs FSSC 22000 – Key Differences and Document Numbering Tips How to Conduct an Environmental Risk Assessment under FSSC 22000 V6.0 FSSC 22000 Additional Requirements Version 6 Section 2.5.11 FSSC V6 Internal Audit Checklist FSSC 22000 audit man-day calculation FSSC V6 Internal audit Checklist FSSC Lead Internal Auditor Requirements 6.1 Actions to Address risks and opportunities FSSC 22000?