How to assess the hazard risk for hazard types in different production steps
Dears,
I need to know the right method of risk assessment and to determine the step control level ( PRP , OPRP , CCP )
lets put a rule first ( if the risk degree is more than 6 and the control is by observation it will be OPRP ) and ( ( if the risk degree is more than 6 and the control is by measurement , it will be CCP )
if the hazard type risk degree is in the first step is 9 and the control of it is in the second step , and the second step risk degree is also 9 , so what shall I write at the two steps are both are OPRP or only the control step is the OPRP.
Example : is attached
in this case what shall I write in the control type in the step 1 OPRP or PRP as the control point actually at the step 2 . although the risk degree at the two steps are the same.
Dears,
I need to know the right method of risk assessment and to determine the step control level ( PRP , OPRP , CCP )
lets put a rule first ( if the risk degree is more than 6 and the control is by observation it will be OPRP ) and ( ( if the risk degree is more than 6 and the control is by measurement , it will be CCP )
if the hazard type risk degree is in the first step is 9 and the control of it is in the second step , and the second step risk degree is also 9 , so what shall I write at the two steps are both are OPRP or only the control step is the OPRP.
Example : is attached
in this case what shall I write in the control type in the step 1 OPRP or PRP as the control point actually at the step 2 . although the risk degree at the two steps are the same.
Hi mhosn,
I assume you are referring to allocating PRPs, CCPs, OPRPs in iso22000 or fssc22000 standards.
There is a veritable encyclopedia of published methods to respond to yr queries, eg -
FSSC22000 Guidance ver.5.pdf 666.91KB 34 downloads