What's New Unreplied Topics Membership About Us Contact Us Privacy Policy
[Ad]

Using Magnetic Frames in Production Areas

Started by , Oct 07 2024 02:37 PM
3 Replies

Hi I am loving this site and the knowledge so thank you. We are going for our full BRC audit and I have just put up a few A4 magnetic frames in our production area with the 5 Lean workplace and the 8 wastes of lean manufacturing.

 

I have read about testing the magnetic strengths but this are used purely used as visual aids.

 

These are on Kingspan walls away from any machinery, could someone recommend or help with a template or procedure please.

 

We have a policy in place for metal detection and only use MD pens and clipboards on site.

 

Thank you.

 

SK :) 

Share this Topic
Topics you might be interested in
Production Room Layout Query: Accessing Cold Room via Changing Area Correct sequence for putting on clean attire before entering a production room Technical Guidance for Factory-Scale Tempeh Production Under BRCGS Controlling Mycotoxins in Production Best Cutting Tools for Solid Frozen Food Blocks in Production
[Ad]

A laminated sign stuck to the wall with a sheet magnet?  I wouldn't expect any issues. 

 

You might want to mention a check of signage, in general, for your operational inspections.  

1 Thank

A laminated sign stuck to the wall with a sheet magnet?  I wouldn't expect any issues. 

 

You might want to mention a check of signage, in general, for your operational inspections.  

 

I might go so far as to Date the document, so auditors know it isn't ancient.

Thank you really appreciate the quick responses, much appreciated.


Similar Discussion Topics
Production Room Layout Query: Accessing Cold Room via Changing Area Correct sequence for putting on clean attire before entering a production room Technical Guidance for Factory-Scale Tempeh Production Under BRCGS Controlling Mycotoxins in Production Best Cutting Tools for Solid Frozen Food Blocks in Production Defining CCPs vs. Preventive Controls in Non-Alcoholic Beverage Production Cleaning Before and After Production – Is It Mandatory? Best production plan for allergen contamination prevention Assessment for Production Risk Zones based on Clause 4.3.1 of BRC Issue 9 Example of Paper Cup Production Flowchart for HACCP