What's New Unreplied Topics Membership About Us Contact Us Privacy Policy
[Ad]

Validation of pasteurization process

Started by , Oct 08 2024 05:42 AM

Hi mrtipex,

 

:welcome:

 

Welcome to the IFSQN forums

 

Normally the calculation is based on the temperature*/time in the holding tube.

 

* Temperature is measured at the end of the holding tube.

 

Kind regards,

 

Tony

1 Reply

In the case of accumulated lethality in a pasteurization process consisting of heating (plate heat exchanger), holding tube, regeneration, and cooling stages: Should the accumulated lethality be calculated considering only the holding tube, or should the other stages be included as well?

 

thanks in advance

Share this Topic
Topics you might be interested in
Allergen risk assessment and validation for allergen transfer to uniforms Shelf life validation for the fermented batter In-House Gluten Testing – Do COA Results Require Validation? Cleaning validation procedure Drying Process Validation
[Ad]

Hi mrtipex,

 

:welcome:

 

Welcome to the IFSQN forums

 

Normally the calculation is based on the temperature*/time in the holding tube.

 

* Temperature is measured at the end of the holding tube.

 

Kind regards,

 

Tony

1 Thank

Similar Discussion Topics
Allergen risk assessment and validation for allergen transfer to uniforms Shelf life validation for the fermented batter In-House Gluten Testing – Do COA Results Require Validation? Cleaning validation procedure Drying Process Validation Dehydration kill step validation Importance of transport cleaning validation and verification Importance of transport cleaning validation and verification Importance of transport cleaning validation and verification Bactiscan as cleaning validation?