Maintenance Risk Assessment for Tesco Audit
Started by fouziak, Nov 06 2024 05:05 PM
Hello,
We will have a TESCO audit and we have a requirement related to the assessment to be done before any maintenance intervention.
Do you have an idea about it? what we should do exactly?
Any documents please to share?
Thank you
Metal detector verifying after maintenance
How to create a maintenance schedule for HTST Pasteurizer?
Electronic Maintenance Records for BRCGS Compliance
Maintenance of CCP Equipment
How should acetone use in packaging equipment maintenance be addressed in an SQF audit?
[Ad]
Hi ;)
I believe you are referring to section 25.5 -
Risk assessments must be completed prior to work commencing to ensure product and packaging is not put at risk.
Engineering activities must be controlled. For example, welding, drilling, riveting, and soldering must not take place on equipment while it is being used for production or on any equipment immediately adjacent unless suitable hygienic screening is in place
A few questions shall be added to your job sheet records ;
Is there a food safety risk? Y/N
Is there a Foreign Body or cross-contamination risk? Y/N
if yes, the equipment should be removed from production or engineering activities should be performed outside production hours. Alternatively, screens shall be used.
;)
1 Thank
Metal detector verifying after maintenance
How to create a maintenance schedule for HTST Pasteurizer?
Electronic Maintenance Records for BRCGS Compliance
Maintenance of CCP Equipment
How should acetone use in packaging equipment maintenance be addressed in an SQF audit?
Need Training Materials for Maintenance Hygiene
Job description for maintenance and production
Hygiene for maintenance and production
Maintenance Shop Cleaning Requirements
Training maintenance GMP