What's New Unreplied Topics Membership About Us Contact Us Privacy Policy
[Ad]

FSSC 22000 Equipment Management Procedure: Template Request

Started by , May 14 2025 01:42 AM
2 Replies

Good morning All, can anyone please share a template for the above.  Thanks Thevan 

Share this Topic
Topics you might be interested in
Climate Change Risk Assessment for FSSC 22000 Packaging Producers FSSC 22000 Announce the Release of FSSC Development Program V2.0 Clarifying FSSC 22000 V6 Clause 2.5.5 on Positive Testing Trends Looking for Study Materials for FSSC 22000 Version 6 Lead Auditor Exam SQF vs FSSC 22000 – Key Differences and Document Numbering Tips
[Ad]

Hi Thevan,

 

:welcome:

 

Welcome to the IFSQN forums.

 

This is a case of having specifications for purchased equipment and controlling changes to equipment.

 

Referring to FSSC 22000 Additional requirements 2.5.15 Equipment Management (All excluding FII):

In addition to clause 8.2.4* of ISO 22000:2018, the organization shall:

a) Have a documented purchase specification in place, which addresses hygienic design, applicable legal and customer requirements, and the intended use of the equipment, including product handled. The supplier shall provide evidence of meeting the purchase specification prior to installation.

b) Establish and implement a risk-based change management process for new equipment and/or any changes to existing equipment, which shall be adequately documented including evidence of successful commissioning. Possible effects on existing systems shall be assessed and adequate control measures determined and implemented.

 

* ISO 22000 8.2.4 When establishing PRPs the organization shall consider: … e) the suitability of equipment and its accessibility for cleaning and maintenance;

 

Specifications should be straight forward, I use a process change approval record for changes which can be short for minor changes or more detailed for major changes. There should also be commissioning records for installation of significant items, this would include operation & maintenance instructions and training for all relevant staff.

 

See an example of a Process Change Approval Form here:

 

Process Change Approval Form Example.png   464.94KB   0 downloads

 

Kind regards,

 

Tony

Thanks Tony, appreciate your response.  Regards Thevan 


Similar Discussion Topics
Climate Change Risk Assessment for FSSC 22000 Packaging Producers FSSC 22000 Announce the Release of FSSC Development Program V2.0 Clarifying FSSC 22000 V6 Clause 2.5.5 on Positive Testing Trends Looking for Study Materials for FSSC 22000 Version 6 Lead Auditor Exam SQF vs FSSC 22000 – Key Differences and Document Numbering Tips How to Conduct an Environmental Risk Assessment under FSSC 22000 V6.0 FSSC 22000 Additional Requirements Version 6 Section 2.5.11 FSSC V6 Internal Audit Checklist FSSC 22000 audit man-day calculation FSSC V6 Internal audit Checklist