Does a Change in the Flow Diagram Require EMP Review?
Started by Touchdown, Jun 12 2025 03:09 AM
If the plant change the process of the flow diagram or add new equipment in production. Do you need to review the EMP.
BRC Acceptability of Lab Accreditation Change
Climate Change Risk Assessment for FSSC 22000 Packaging Producers
What to Include in a Food Safety-Focused Management of Change Assessment
Flow Chart - Water in the recipe - Step or Ingredient
Does the USDA Require 2016 Nutrition Fact Panel Format or Allow 1990 Format?
[Ad]
Hi Touchdown,
Changes to the process or new equipment should result in a review and update of any relevant site procedures that are affected such as:
Operating procedures
Maintenance
Cleaning
Environmental monitoring
Internal Audits/Inspections
Training
Kind regards,
Tony
You have to check everything in the new process flow. Even if there is no change, you must review and confirm it.
BRC Acceptability of Lab Accreditation Change
Climate Change Risk Assessment for FSSC 22000 Packaging Producers
What to Include in a Food Safety-Focused Management of Change Assessment
Flow Chart - Water in the recipe - Step or Ingredient
Does the USDA Require 2016 Nutrition Fact Panel Format or Allow 1990 Format?
Does Collected Dust Need to Be in HACCP Flow Diagram?
Does SQF Require a Separate Handwashing Sink in Onsite Labs?
Do USDA-FSIS Require Listeria to Be Listed as a Hazard in HACCP Plans?
Does Adding Water to Dilute Vinegar Require Labeling as an Ingredient?
Does Shelf-stable Prosciutto require refrigeration?