Is this possible to have brcgs with excluded scope. and there is no physical segregation of the building but only time and scheduling segregation. 

Share this Topic
Topics you might be interested in
Determining Sensitivity of Inline Magnets – BRCGS Compliance BRCGS Unannounced Audit: Date Range Confirmation Needed BRCGS Food Standard Top 10 Certification Audit Non-Conformances in 2022 Hazard Rating in BRCGS Pack 7 – One or Two Significance Scores? Key Requirements in BRCGS Packaging Issue 7
[Ad]

I highly doubt this (as you described) would be allowed.

 

Now if there was physical separation - possible, however the area is still subject (just like with SQF) to inspection to ensure that there is nothing from that area that could impact on the area included in the certification (scope.)

BRCGS have got very strict on scope exclusions. If you look at p100 of the standard it clearly sets out that it is not allowed unless "the products are produced in a physically segregated area of the factory". 

 

So in this instance I think it's totally clear, it cannot be excluded from scope if you are only segregating by time.

Why would you want to by the way?


Similar Discussion Topics
Determining Sensitivity of Inline Magnets – BRCGS Compliance BRCGS Unannounced Audit: Date Range Confirmation Needed BRCGS Food Standard Top 10 Certification Audit Non-Conformances in 2022 Hazard Rating in BRCGS Pack 7 – One or Two Significance Scores? Key Requirements in BRCGS Packaging Issue 7 What’s New in BRCGS Global Standard Packaging Materials Issue 7? Risk Zoning for Tempeh Production: Low-Risk or High-Risk Under BRCGS? Internal Audit Scheduling Under BRCGS Packaging Standard v7 Should We Use BRCGS START! or Go Directly for Full Certification? How Often Must Product Specifications Be Reviewed Under FDA/BRCGS?