SQF Section 2.5.3 Verification Schedule
Started by jalvarado, Mar 16 2012 05:07 PM
In preparation for this year's SQF audit I need some guidance or input from others regarding how they put a verification schedule together as briefly described in section 2.5.3. All of our verification activities are listed as or in procedures. the list is very long as far as everything that is verified/checked throughout a production cycle. How detailed should the verification schedule be? Does anyone have an example of one I could look at to get my brain to start storming ideas?
Allergen validation and verification as per FSSC Version 6.0
Water hoses and nozzles - maintenance and cleaning schedule
Verification & Validation - scheduling, methods, etc.
What kind of Verification is required for Maintenance and Sanitation?
Validation and Verification: Ensuring Compliance and Excellence
[Ad]
Try this one for inspiration :)
Attached is a sample of an internal audit schedule and a verification schedule.
Attached is a sample of an internal audit schedule and a verification schedule.
Attached Files
1 Like7 Thanks
Nice,
Thanks for sharing,
Thanks for sharing,
Allergen validation and verification as per FSSC Version 6.0
Water hoses and nozzles - maintenance and cleaning schedule
Verification & Validation - scheduling, methods, etc.
What kind of Verification is required for Maintenance and Sanitation?
Validation and Verification: Ensuring Compliance and Excellence
Validation and Verification: Ensuring Compliance and Excellence
Validation and Verification: Ensuring Compliance and Excellence
PRP Verification Activities
X-ray monitoring and verification
Metal Detector Frequency and Verification