What's New Unreplied Topics Membership About Us Contact Us Privacy Policy
[Ad]

Anyone have a procedure for the formal release of finished product?

Started by , May 26 2013 09:16 PM
2 Replies

Hi there,

Does anyone have a procedure developed for the formal release of finished product?  It is a BRC standard (5.6) and new to WQA.

Thanks,

Paula

 

Share this Topic
Topics you might be interested in
When Is Product Rework Acceptable? Can I Personally Train a New HACCP-SQF Practitioner Without Formal Courses? New Product Development New Product Development Does anyone have a procedure for pest control?
[Ad]

Hi there,
Does anyone have a procedure developed for the formal release of finished product? It is a BRC standard (5.6) and new to WQA.
Thanks,
Paula

Dear Paulajgr,

This is usually mixed in with, so-called, positive release, eg see this post -

http://www.ifsqn.com...indpost&p=58268

generally can try these threads for ideas -

http://www.ifsqn.com...ent/#entry37410

and, going back a bit -

http://www.ifsqn.com...ram/#entry28415

I don't think any of these contain a specific procedure / sample form. Personally i just made up the procedure to refer to a form - an excel with columns for date / lot ref / selected checked results (ie tickable box for "satisfactory" column / a xrefs (eg lab form) for [cumulated] various options. Seemed to evoke no auditor negativity after my initial attempt at negative-release (eg 3rd column = no reported problems) was frowned upon :smile: .

Rgds / Charles.C

Hi there,

Does anyone have a procedure developed for the formal release of finished product?  It is a BRC standard (5.6) and new to WQA.

Thanks,

Paula

Not sure if it will work with the BRC standard. What I use is the Quality Control Log, the log includes the finished product meets specifications to be released for sale. The log is based off continuous checks within a run/lot#. The log includes product name, quality control of packaging, weight, size, no visible defects, no tampering, time, date etc. Then finally the last column has an area for the QC rep to initial signing off the lot to be okay to release. You need to include in your log a column for product/run/lot# that did not meet specs to be released and corrective actions procedure. Good luck.  


Similar Discussion Topics
When Is Product Rework Acceptable? Can I Personally Train a New HACCP-SQF Practitioner Without Formal Courses? New Product Development New Product Development Does anyone have a procedure for pest control? RASFF 2024 Overview: Top Product Groups and Hazards No mock recall conducted with reworked product What Happens When You Remove Product Lines from Your BRC Scope? Supplier Approval System for Third-Party Manufacturers of Own Brand Product Private Label Product Shipping Without Full PDP – FDA Compliance?